Design proposals
A full proposal, from site analysis and sun studies to plans, elevations and day and night renders.
Dev 360 solution · Design and 3D visualisation
Design Studio is Dev 360's own design and 3D visualisation solution for landmark homes, hospitality, commercial and experience spaces. It brings the sciences, architecture and design together, works with architecture partners from first sketch to handover, and has developed a flagship cinema experience centre concept.

Flagship · Design Studio
A cinema and smart-living experience centre concept: a parametric reception and entrance lobby, lounge cinema, star-ceiling home cinema, bar lounge, media wall and living suites, designed by a Dev 360 Associate. The format can be adapted for showrooms, hospitality, estates and private homes.






Workplace · Site photographs
Reception, boardroom, lounge and workspaces designed as one calm sequence of light and dark surfaces, with light lines in the floor, walls and ceiling that lead people through the space. Site photographs of the finished interior, design by a Dev 360 Associate. Client and location are confidential.






Site photographs. Design by a Dev 360 Associate.
The studio
Design Studio brings four disciplines to each project: the pure and social sciences, architecture and design. Architectural work is carried out by registered architects. The result is space planned around how people will live and work in it, and how the building will perform and be maintained, not only how it looks.
Design Studio brings together the design disciplines and specialists needed for each brief. Roles, outputs and any delivery responsibilities are agreed in writing.
Delivered by Dev 360
6 services, scoped in writing, with design by a Dev 360 Associate.
A full proposal, from site analysis and sun studies to plans, elevations and day and night renders.
Interiors and zones planned around how people will live and work in the space.
Renders and walkthroughs that let owners decide before they build.
Gardens, courtyards, pool decks and roof gardens designed with the building, with landscape specialists.
Design-led delivery from first sketch to final key, with registered architects and specialists.
Hotels, conference venues and healthcare facilities planned around their users.
Selected work · Confidential
A bedroom suite built around a sculpted headboard wall of crossing light lines, with a detailed dressing room and a ribbed, lit ceiling. Client, project name and location are confidential.



Selected work · Confidential
A curved, fully glazed tower over a conference podium, with a terrace restaurant, a covered drop-off and a palm-lined forecourt. Concept visualisation; client and location confidential.

Selected work · Confidential
A terraced family home designed for a 50-year life: eight en-suite bedrooms, a prayer room for 25, a cinema, a six-car show garage, staff suites, rooftop solar and roof gardens. Client, project name and location are confidential.








Every Design Studio proposal follows the same sequence, so owners can decide with the full picture.
Architecture: plans that need a registered professional are prepared and signed through Dev 360 Architecture, delivered with Architecture and planning, a PPP participant.
Agree the use, budget range, programme and what must be decided first.
Site and sun studies, zoning and a design direction with precedents.
Plans, interiors and day and night renders so owners decide before they build.
Coordinate architects, engineers and builders through approvals and handover.

How Dev 360 is planning a five-phase upgrade of a working private hospital: external works, wards, a new theatre and public areas, without stopping…

A multi-site pharmacy and healing centre: floor plans digitised into a 3D model, plumbing and electrical audits, and a fix-first plan for its…
When to call
Guides and checklists
Hiring architects and designers? Trustees should verify SACAP registration of the person submitting plans.
Hiring landscapers? Trustees should check water restrictions, irrigation rules and invasive-species obligations.
Hiring property developers? Trustees should verify NHBRC registration for home building and approvals for planning work.
What a turnkey commercial project includes, from brief, feasibility and design coordination to appointments, construction oversight and handover.
What to prepare before a commercial project: a written brief, budget range, site and building information and the approvals likely to be needed.
Check each source’s current version before acting.
Design Studio prepares design proposals, interior and spatial design, 3D visualisations, renders, landscape concepts and experience-space design. Dev 360 agrees the scope in writing and coordinates delivery through handover.
Yes. Design Studio is a Dev 360 solution, not a separate participant. Design work is carried out by a Dev 360 Associate and scoped directly with the client.
Yes. Its flagship is a built cinema and smart-living experience centre. Design Studio plans seating, sightlines, acoustics, lighting and hidden technology together, for showrooms, hospitality venues, estates and homes.
In South Africa, plans submitted to a municipality must be prepared or signed by a person registered with SACAP in a category that covers the work. Dev 360 provides this through its Architecture solution with Architecture and planning.
The cinema experience centre, residential and hotel images are design visualisations, not photographs of completed buildings. The executive office images are site photographs of a finished interior.
Design Studio works across South Africa and internationally, remotely and on site in Gauteng, with the scope, responsibilities and contracting party confirmed in writing first.
Architecture support through Architecture and planning.
Renders, walkthroughs and design proposals.
One accountable team from brief to handover.
Design-led development facilitation.
Design Studio
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360