Retail store fit-out, Lakeside Mall
Lighting, outlets and device connections, the distribution system, backup power, emergency lighting and exit signs, all tested and inspected before the store opened.

PPP participant · Construction and trades
Electrical installation, maintenance and verification.
Electrical installation, maintenance and verification. Dev 360 can discuss a suitable specialist for a defined need. Current capacity, credentials and appointment are confirmed through a conversation with Dev 360.
Find Electrical capability online:Website ↗Facebook ↗Instagram ↗LinkedIn ↗

Capability, not a public participant profile
Electrical installation, maintenance and verification. This page describes a capability category, not a named provider or a verified credential held by Dev 360.
Specialist identity, capacity and appointment are discussed privately with the relevant permission. Professional registrations, insurance, references and project-specific suitability must be checked before appointment.
In pictures
This capability page is not a Dev 360 delivered-project claim. Provider identity, relevant references, credentials and permission to share them are checked privately for the proposed scope.
Track record
As published by Electrical capability.
Lighting, outlets and device connections, the distribution system, backup power, emergency lighting and exit signs, all tested and inspected before the store opened.
Wiring and lighting, kitchen-appliance connections, distribution, emergency lighting and signage, coordinated with the other contractors on site.
A 10 kVA system with 20 panels, connected to the grid, then tested and commissioned. The homeowner got training, documentation, warranties and monitoring support.
Site assessment, system design, procurement, then installation of the generator, fuel lines and wiring, followed by commissioning and operator training.
This capability page is not a Dev 360 delivered-project claim. Provider identity, relevant references, credentials and permission to share them are checked privately for the proposed scope.
Outsource through Dev 360
8 services, scoped by Dev 360 in writing and delivered by Electrical capability.
New-home wiring, renovations, fault finding, outlets, switches, breakers and home automation.
Office and factory wiring, machinery connections, commercial appliances and power distribution.
Inspection, testing and fault diagnosis. A registered electrician issues the CoC when the installation complies.
Solar PV, inverters, batteries and generator connections, sized to the property's load profile.
Feature, security, warehouse, outdoor and common-area lighting, designed for lower consumption.
Lightning-risk assessment, air terminals, down conductors and earth termination, installed and tested.
Thermal scans find hot spots, loose connections and overloaded circuits while the supply stays on, followed by a written report.
Breakdown response around the clock, plus scheduled and preventative maintenance to cut downtime.
In their clients' words
“My experience with Electrical capability exceeded my expectations in every aspect. Their professionalism, expertise, and unwavering commitment to customer satisfaction make them a standout choice.”
Published reviews from powerflowelectrical.co.za.
When to call
As published by the business. Check current status with the issuing body.
Guides and checklists
Hiring electrical contractors? Trustees should verify the contractor's current Department of Employment and Labour registration.
What sectional title trustees should check before hiring for solar and renewables: registrations, certificates, rules, handover documents and…
Hiring backup power installers? Trustees should use a registered electrical contractor and check fuel-storage, noise and fire requirements.
How a body corporate can install rooftop solar without a large special levy, using energy-as-a-service, and the STSMA resolutions and NERSA rules…
Who pays for generators, inverters, batteries and water tanks in a sectional title complex, and which resolutions PMR 29 requires before installation.
How trustees can assess water, electricity, backup power and other infrastructure issues in a complex, and when to bring in registered specialists.
This capability area covers electrical installation, maintenance and verification. The relevant specialist, availability, scope and responsibilities are confirmed for each enquiry; this page is not an appointment.
Dev 360 discusses the need, relevant experience, professional requirements and availability. Any introduction is permission-based. Buyers should check the evidence relevant to the actual appointment.
The written proposal identifies the contracting parties, scope, fees and responsibilities. Regulated advice and professional sign-off remain with the appropriately qualified person or firm.
Suitable provider details may be shared privately for a specific, permission-based conversation. Dev 360 does not publish a participant register.
No. A capability description is not a promise of availability, an appointment, funding, approval or a result. Each party decides whether to proceed on agreed written terms.

Precision plumbing. Expert construction.
Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Building and finishing trades, one crew.
Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling

Solutions provider to the shopfitting and furniture manufacturing industry.
Services: Shopfitting and interiors · Furniture and joinery · Property condition assessments · Remedial scopes and BOQs · Maintenance and upgrades · Coatings and surface repairs

Shaping spaces, enabling dreams.
Services: Construction design · Building construction · Civil works · Electrical and mechanical works · Fire detection and suppression · Asbestos works · Solar energy and UPS systems · Project management · Property valuation · Furniture removal and site preparation
Request a quote or introduction
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360