Hiring gas installers for a sectional title scheme
Hiring gas installers? Trustees should confirm the installer is a current SAQCC Gas-registered practitioner.
Energy and utilities
Gas work should be carried out by a suitably registered gas practitioner, and a certificate of conformity should be obtained where required for the installation. Owners and trustees should confirm the practitioner’s current registration, the scope covered and any applicable safety requirements. Keep the certificate and maintenance records with building documents, and do not treat a certificate as a substitute for ongoing inspection or safe operation.

Before work starts, confirm the practitioner’s registration for the relevant gas category and ask who will be responsible for design, installation, testing and handover. Make sure the quotation identifies appliances, pipework, cylinders or storage, ventilation and any alterations to common property. Gas work affects fire and life safety, so avoid informal alterations or relying on an installer’s verbal assurance without checking credentials and documentation.
A certificate of conformity records that specified gas work was assessed against applicable requirements by a qualified person. Ask what parts of the installation it covers and retain it with plans, appliance details and service records. Check cylinder location, securing, ventilation, access, signage and protection from impact as relevant to the design. The certificate does not remove the need to maintain appliances, respond to leaks or follow manufacturer instructions.
In a sectional title building, determine whether the installation serves a unit or common property and who controls access, maintenance and emergency response. Trustees should keep a register of certificates and contractor details, and communicate procedures for reporting gas odours or damage. Check whether building approvals, fire requirements or municipal rules apply to the proposed work. Dev 360’s body corporate interventions can help trustees coordinate complex property decisions.
Requirements depend on the nature of the gas work and applicable regulations. Ask a registered gas practitioner or relevant authority which certificate and inspection records are required for the specific installation.
Gas work should be done by a practitioner appropriately registered for the work. Verify registration before appointing anyone and keep the resulting compliance documents with the building records.
Follow the practitioner’s advice, appliance manufacturer instructions and applicable requirements. Inspect after changes, damage, suspected leaks or poor performance, and keep maintenance evidence for trustees.
Hiring gas installers? Trustees should confirm the installer is a current SAQCC Gas-registered practitioner.
How trustees can assess water, electricity, backup power and other infrastructure issues in a complex, and when to bring in registered specialists.
A 30-day checklist for newly elected sectional title trustees: duties, documents, money, maintenance, insurance, conflicts and the CSOS rules that apply.
Talk to Dev 360