10-year maintenance plan checklist for sectional title trustees

PMR 22 requires a written plan for every major capital item of the common property expected to need maintenance, repair or replacement in the next 10 years. For each item it must state the current condition, when work is due, the estimated cost and expected life afterwards. Members approve it at a general meeting, and trustees report on it at every AGM.

By the Dev 360 teamSouth African context
Maintenance worker inspecting the roof of a sectional title complex

Key takeaways

  • PMR 22 makes the 10-year plan a legal requirement, not good practice
  • Each item needs condition, timing, cost and expected life
  • The plan drives the reserve contribution through a simple formula
  • Trustees report on implementation at every AGM; updating it yearly is sensible

What PMR 22 requires

The Prescribed Management Rules require the body corporate or its trustees to prepare a written maintenance, repair and replacement plan for the common property. It covers the major capital items expected to need work within the next 10 years. Major capital items include electrical systems, plumbing, drainage and storm-water, heating and cooling, lifts, roofing, painting and waterproofing, communication and service systems, parking, roads and paved areas, security and recreational facilities.

The trustee checklist

  • Every major capital item is listed, including items owners forget, such as storm-water and boundary walls
  • The present condition of each item is recorded, ideally from a professional inspection
  • The timing of the next maintenance, repair or replacement is stated
  • The estimated cost is realistic and dated
  • The expected life after the work is recorded
  • Any other relevant information, such as warranties and compliance certificates, is attached
  • The reserve contribution for each item is calculated with the PMR 22 formula
  • The plan was approved by members at a general meeting, and the resolution is minuted
  • The trustees' AGM report says what was done, what slipped and why

How the plan sets the reserve contribution

For each item, the annual contribution is the estimated cost minus what has already been set aside, divided by the remaining years of expected life. Add the items together for the plan's yearly figure, then check it is not below the statutory minimum in the reserve fund calculator.

Keeping it current

PMR 22 requires the trustees to report on implementation at each AGM. It does not set a separate review deadline, but updating the plan every year before the AGM, and after any major failure, keeps costs and the reserve honest. Commission an independent condition assessment every few years.

Sources

Check each source’s current version before acting.

Through the PPP

Participants who deliver this

These PPP participants deliver this kind of work.

Dev 360 capability
Construction and trades

Plumbing and maintenance

Precision plumbing. Expert construction.

Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Dev 360 capability
Construction and trades

Electrical capability

Your reliable electrical contractor.

Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Dev 360 capability
Building materials and coatings

Protective coatings supplier

Don't just cover the problem, solve it smarter.

Services: Waterproofing and water repellency · Rising-damp treatment · Stone protection · Timber protection · Masonry and exterior paints · Heat-reflective roof coatings · Photocatalytic mineral coating · Primers and cement additives · Cleaning and restoration

Not a guarantee of work. All participants

Short answers

Is a 10-year maintenance plan compulsory for sectional title schemes?

Yes. PMR 22 of South Africa's Sectional Titles Schemes Management Act regulations requires a written plan for major common-property items expected to need maintenance, repair or replacement over the next 10 years. The plan covers expected work and supports the scheme's reserve planning.

Who approves the 10-year maintenance plan?

The members approve a sectional title scheme's 10-year maintenance plan at a general meeting. Once approved, it takes effect, and trustees report on implementation at each annual general meeting. These requirements come from South Africa's PMR 22 framework for common property maintenance planning.

How does the maintenance plan affect levies?

The plan helps determine the reserve contribution in South African sectional title schemes. For each item, subtract amounts already saved from its estimated cost, then divide by its remaining life; total the item contributions for the reserve fund. An unrealistic plan can leave the scheme underfunded and lead to special levies.

Get in touch