Architectural design
Concept to developed design for new and existing buildings.
Dev 360 solution · Architecture
Dev 360 Architecture covers building design, municipal submission drawings, refurbishment and adaptive reuse, delivered with Architecture and planning, a Johannesburg practice in the Preferred Participation Panel (PPP). Dev 360 scopes the work, coordinates engineers and builders, and coordinates the registered professionals who sign the plans.

At a glance
| Best for |
|
|---|---|
| Not the right fit if |
|
| What you get | Design, submission drawings, council coordination and construction documentation |
| How it is priced | Written scope and fee proposal in rand, staged against deliverables |
| Where | Gauteng, and other provinces by arrangement |
| Who delivers | Architecture and planning (PPP participant), coordinated by Dev 360, with Design Studio for interiors and visualisation |
Concept to developed design for new and existing buildings.
Plans for municipal approval under the National Building Regulations and SANS 10400.
Design for upgrading and repurposing existing buildings.
Coordinated drawings for tender and building, with engineers.
Survey the site or building, collect title deed, zoning and existing plans.
Concept and developed design, tested against zoning, budget and programme.
Prepare and lodge submission drawings with the municipality, with engineers where needed.
Construction documentation, site queries and the drawings needed for occupation.
Architecture and planning is a Johannesburg architectural practice incorporated in 2021 and a participant in the Dev 360 Preferred Participation Panel. It delivers the architecture. Design Studio adds interiors, spatial design and 3D visualisation. Dev 360 scopes the work in writing, coordinates engineers and contractors, and stays your single point of contact. Each party's role is named in the proposal.
Plans submitted to a municipality must be prepared or signed by a person registered with SACAP in a category that covers the work. Dev 360 confirms the registration of the professional signing your plans before work starts.
Most extensions need approved plans under the National Building Regulations, and those plans must be prepared by a SACAP-registered person. Dev 360 Architecture can scope the drawings and coordinate the submission.
Approval times vary by municipality and by how complete the submission is. Dev 360 reduces delays by checking zoning, title conditions and engineering input before plans are lodged.
Often, yes. As-built drawings are prepared and submitted, sometimes with engineering certificates. Dev 360 Architecture can assess the work and prepare the submission with Architecture and planning.
Check SACAP registration of the person submitting plans.
Answers on design, plans, approvals and visualisation.
Interiors, spatial design and 3D visualisation.
Check each source’s current version before acting.
Architecture
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360