All 43 industry spotlights
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Mechanical & electrical · PPP spotlight
Before hiring lift contractors, trustees should use an accredited inspection service provider with a registered lift inspector. At handover, insist on a valid comprehensive report and maintenance records. The key standard here is Lift, Escalator and Passenger Conveyor Regulations. A common mistake: lapsed comprehensive reports.

Start with the six baseline checks that apply to every contractor. Because lifts and vertical transport is a major capital item, it also belongs in the 10-year maintenance plan.
Check each source’s current version before acting.
Important. Generic guidance for lifts and vertical transport. Confirm the current municipal rules for your site.
Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.
A lift needs a comprehensive report at intervals no longer than 24 months, and after installation, modification or serious failure. Trustees should track these dates and retain reports under the South African Lift, Escalator and Passenger Conveyor Regulations.
The lift file should include a current comprehensive report and maintenance and test records. The report is required after installation, modification or failure and at intervals no longer than 24 months under South African lift regulations; keep the records available to trustees.
Lapsed comprehensive reports and maintenance contracts without performance terms can leave lift risks unmanaged. Trustees should track inspection dates under South African lift regulations and agree clear response and service commitments with the maintenance provider.
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Hiring electrical contractors? Trustees should verify the contractor's current Department of Employment and Labour registration.
Hiring plumbers? Trustees should check the plumber's qualifications and the municipality's plumbing compliance rules.
Talk to Dev 360