Commercial turnkey projects
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
Commercial projects
For a hospitality fit-out involving gas, use an appropriately authorised gas practitioner and confirm the installation, inspection and certificate requirements that apply. Coordinate equipment specifications, ventilation, routes and commissioning before procurement. Keep the relevant certificate and supporting records at handover, and confirm requirements with the regulator or competent practitioner because the system type and work determine the applicable rules.

Commercial kitchens and hospitality spaces may use gas appliances that affect layout, ventilation, storage and service routes. Confirm appliance requirements, supply type and installation constraints before finalising the design. Coordinate with the landlord, mechanical team, fire consultants where applicable and other trades. Changes made late can affect extraction, clearances, access and programme. Do not allow equipment orders to proceed until the project team has checked compatibility with the planned installation.
Use a practitioner authorised for the relevant gas work and ask them to confirm the applicable design, testing and certification steps. Agree who supplies equipment, pipework, isolation points and commissioning, and document what falls outside the contract. The contractor should coordinate safe work and access with the building representative. Avoid relying on a generic statement that a system is “compliant” without knowing which work was assessed and which certificate or record is required.
Before handover, obtain the applicable certificate and records, check that the installed equipment operates as intended, and ensure operating staff receive relevant instructions. Record any outstanding item and do not use affected equipment until the responsible practitioner confirms it is safe and the required approvals are in place. Keep the records with maintenance information for future service work. Requirements can depend on the installation and current rules, so verify details with the competent practitioner or regulator.
Use a gas practitioner authorised for the relevant type of work. Confirm the practitioner’s credentials and the applicable requirements before appointment.
Certification requirements depend on the installation and work. Ask the authorised practitioner to confirm which documents apply and ensure they are included in handover.
Do not use gas equipment until the responsible practitioner has completed required testing and confirmed the system is safe and ready for use. Confirm approvals and operating instructions first.
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
Use a structured snag list and handover checklist to track defects, operating information and compliance records on a commercial fit-out.
Compare scope, capability, contract terms and risk allocation before appointing a South African commercial project contractor. Review terms.
Talk to Dev 360