Dev 360

Design Studio portfolio

A family residence, designed for 50 years

From the Design Studio portfolio, designed by a Dev 360 Associate: a family residence planned around a 50-year service-life ambition, which is design intent rather than a verified lifespan. The full design proposal covered the site, sun studies, zone planning, floor plans and sections, interior and landscape design, and high-resolution visualisation, built around the family's way of life and a dedicated prayer room.

Design visualisationClient details kept confidential
Front elevation of the villa: angular concrete wings around a glazed core, design visualisation
Sector
Private residential
Design
Design Studio, with architectural and landscape specialists
Stage
Design visualisation
Client and location
Confidential

The challenge

What needed solving

The brief asked for contemporary, timeless elegance making the most of the site, the views and the weather. The home had to reflect the family's principles of efficiency, integrity and beauty, and keep meeting them for at least 50 years.

The studio's approach

How Design Studio approached it

  1. Sun and site first

    Sun studies for June and December, morning to late afternoon, shaped where living spaces, terraces and pools sit on the slope.

  2. Zones before rooms

    Each floor was planned as zones: family, formal, guest, staff, office and entertainment, so the house works for daily life and for hosting large gatherings.

  3. Built to last

    Rooftop solar farms, roof gardens, a lift to every level and generous service zones support a long, adaptable life.

  4. Visualised in detail

    Interior perspectives, focal-zone studies with precedents, landscaping and high-resolution day and night renders let the family see the home before it is built.

Scope

  • A prayer room for 20 to 25 people and a grand salon
  • Formal dining for 24 and family dining inside and alfresco
  • Eight en-suite bedrooms, including a master suite
  • A private office suite with boardroom, lounge and work zones
  • A schoolroom, library, cinema for 24 and entertainment zone
  • A six-car show garage, gym and outdoor sports zone
  • Staff suites for three live-in staff and full back-of-house services
  • Rooftop solar, roof gardens, pools, fire-pit deck and landscaping

Design visualisation

Stills from the design visualisation. Not photographs of a completed building.

Where it stands. This is Design Studio portfolio work by a Dev 360 Associate. It is not a Dev 360 or PropDev 360 project. These images are design visualisations, not photographs of a completed building. Project names, the client and the location are confidential.

Short answers

What does a full residential design proposal include?

A full residential design proposal turns the brief into a coordinated design package. Design Studio's package included site analysis, sun studies, plans, elevations, sections, interior and landscape design, and high-resolution visualisation, while keeping the family's identity confidential.

Why plan a home for 50 years?

Planning a home for 50 years favours durable materials, adaptable space, a lift, solar power and service areas that are easy to maintain. Those choices shaped Design Studio's design around the family's long-term needs.

Related

Design Studio portfolio

Design-led residential, hospitality and experience-space work through Design Studio, by a Dev 360 Associate: proposals, interiors and 3D visualisation

Digital services

3D visualisation and design

Design proposals, floor-plan digitisation and photo-real visualisation with Design Studio.

Project manager and contractor reviewing drawings in an office fit-out
HealthcareProposal and planning

Phased upgrade of an operating private hospital

How Dev 360 is planning a five-phase upgrade of a working private hospital: external works, wards, a new theatre and public areas, without stopping…

Answers to the questions people ask before they appoint.

Insight

How to assess a development opportunity

Six tests for a development opportunity: location, zoning and approvals, bulk services, market demand, total cost and the due diligence still needed.

Discuss a similar project

Tell us about your project

A few lines is enough.

Every enquiry is read by a person and answered by email.

We use these details to respond to your enquiry. Please do not include ID numbers, banking, health or other sensitive personal information. Our service providers, some outside South Africa, process it for us under agreements that protect it. See the privacy policy.

Get in touch