Electrical capabilityElectrical installations and power distribution
New installations, alterations and power distribution for homes, complexes, commercial and industrial sites.
Electrical capabilityRepairs, maintenance and 24-hour emergency call-outs
Planned maintenance and fault-finding, with emergency call-outs around the clock for outages and safety faults.
Electrical capabilityInspections and certificates of compliance (CoC)
Inspection and testing, with a certificate of compliance issued by a registered electrician when the installation complies. A CoC is needed when a property is transferred and after alterations.
Electrical capabilitySolar and renewable energy systems
Solar PV, inverter and battery systems, including the registration route that applies to the system size.
Electrical capabilityLighting design and LED upgrades
Lighting layouts and LED retrofits for common areas, parking, offices and retail, to cut consumption and improve safety.
Electrical capabilityDistribution board upgrades, earthing and lightning protection
Replacing ageing boards, correcting earthing and adding surge and lightning protection on exposed buildings.
Electrical capabilityInfrared thermography and thermal reports
Thermal imaging of boards and connections to find hot spots before they fail, with a written report for the maintenance plan.
Plumbing and maintenance24/7 emergency plumbing
Burst pipes, blocked drains, geyser failures and water outages attended around the clock.
Plumbing and maintenanceResidential and commercial plumbing
Installation, repair and maintenance of water supply, drainage and sanitary systems in units, complexes and commercial buildings.
Plumbing and maintenanceLeak detection and water management
Finding hidden leaks without breaking open walls and floors, and reducing water lost through the system.
Plumbing and maintenancePipe relining and repair
Relining old pipes from the inside, which avoids demolition where the pipe condition allows.
Plumbing and maintenanceBathroom and kitchen installations
Complete bathroom and kitchen installations and refurbishments, from fittings to finishing.
Building and civil capabilityConstruction design
Turnkey planning from concept to completion, integrating electrical, mechanical and fire-protection systems into one design.
Building and civil capabilityCivil works
Civil construction, external works, paving, fencing and site services.
Building and civil capabilityElectrical and mechanical works
Electrical installations, HVAC, extraction systems and kitchen canopies.
Building and civil capabilityFire detection and suppression
Design, installation and upgrading of fire detection and suppression systems.
Building and civil capabilityAsbestos works
Safe removal, handling and disposal of asbestos, by a registered asbestos contractor where the work requires it.
Building and civil capabilitySolar energy and UPS systems
Design, installation and maintenance of solar PV and uninterruptible power supply systems.