Design Studio
Design Studio: interiors, experience spaces and 3D visualisation, from a parametric experience centre lobby to signature bedroom suites.
Design and architecture
Plan home cinema lighting in layers: low-glare viewing light, safe circulation light, task lighting for setup and cleaning, and any decorative feature lighting. Put scenes and controls where users can operate them without disrupting a film. Check reflections, dimming compatibility, emergency needs and maintenance access with the relevant specialists. A star ceiling can add atmosphere, but it should not compromise visibility or serviceability.

Different activities need different light levels and directions. A viewing scene may be subdued, while entry, seating and cleaning require more usable illumination. Plan circulation lighting so people can move safely without washing the screen with glare. Place task light for equipment access and maintenance. Distinguishing these functions early helps avoid a single lighting circuit that is either distracting during viewing or inadequate when the room is in use.
Check luminaire positions against the screen, seating and reflective surfaces. Specify suitable dimming and control equipment with the electrical designer or installer, and confirm that devices work together before procurement. Consider where controls are located, what happens when a scene is selected, and how users can find the exit in low light. Decorative stars or cove lighting should be coordinated with ceiling access, ventilation and equipment so the visual effect remains maintainable.
A star ceiling is an optional feature, not a replacement for usable lighting. Review brightness, colour, reflections and the transition between scenes with the room finishes. A concept image can show atmosphere, but construction information should clarify fittings, locations, wiring and controls. Design Studio work includes interior design and visualisation; see the service overview when defining the design outputs needed for a home cinema.
No. Plan separate lighting for safe movement, cleaning and equipment access. Decorative effects should complement practical lighting rather than replace it
Dimming can be useful, but the control system and fittings must be compatible. Confirm the required behaviour with the electrical and lighting professionals
Review fitting positions, beam direction and reflective surfaces against the screen location. Test the proposed lighting scene and adjust the design before installation
Design Studio: interiors, experience spaces and 3D visualisation, from a parametric experience centre lobby to signature bedroom suites.
A cinema and smart-living experience centre designed by a Dev 360 Associate: lounge cinema, star-ceiling cinema and bar lounge.
Plan home cinema sightlines by checking screen position, seat heights, viewing angles and circulation. Use this checklist before finalising the room.
Talk to Dev 360