Dev 360

Tenders, B-BBEE and inclusion

What does functionality scoring mean in a tender?

Functionality scoring assesses how well a bid meets qualitative criteria such as methodology, experience, resources or key personnel. The bid pack should state the criteria, scoring scale and any minimum threshold or sequence of evaluation. Suppliers should map each requirement to clear evidence and answer in the requested format, rather than relying on general claims about capability.

By the Dev 360 teamNovember 2026South African context
Building plans and technical drawings

Key takeaways

  • Extract every scored criterion
  • Match evidence to the scoring method
  • Check thresholds and evaluation sequence
  • Use clear, verifiable examples

Find the complete scoring framework

Read the tender specification, evaluation section, schedules and amendments together. Identify each functionality criterion, its weight or score, the evidence requested and any minimum qualifying threshold. Check whether functionality is evaluated before price and preference points or at another stage. A bid can be technically strong but still score poorly if the response ignores the stated structure or leaves evidence difficult to locate.

Build a criterion-by-criterion response

Create a table that repeats each criterion and lists the response, supporting document, page reference and responsible reviewer. Use project examples that are relevant, accurately described and supported by records. Explain the role performed, scope, timing and outcome without exaggerating. For personnel, provide the qualifications and availability requested. For methodology, describe practical steps, dependencies, quality checks and risk controls that fit the specified work.

Check thresholds and submission quality

Review whether a minimum score applies and which evidence is mandatory before the panel can award points. Confirm that all required forms are signed, files are readable and page limits or formats are followed. Ask questions through the stated channel when a criterion is unclear. A final reviewer should score the draft against the published rubric and identify unsupported claims before submission. Dev 360 shares procurement-related programme information through its initiative page; the consortium is in development.

Sources

Check each source’s current version before acting.

Short answers

Can a bidder challenge a functionality score?

Follow the procurement documents and applicable complaint or review process for that entity. Preserve the bid, evaluation communication and relevant records, and obtain legal advice if considering a formal challenge.

Does functionality always come before price?

The evaluation sequence depends on the applicable procurement framework and bid documents. Read the specific evaluation method rather than assuming a standard sequence for every procurement.

How can a small business show relevant experience?

Use truthful, verifiable evidence that matches the stated criterion. Explain the supplier’s actual role, scope and delivery capability, and do not claim another organisation’s work as its own without an expressly permitted basis.

Tenders, B-BBEE and inclusion

How do preference points work under PPR 2022?

A plain-language guide to South Africa’s Preferential Procurement Regulations 2022, preference points, specific goals and tender-specific evidence.

Tenders, B-BBEE and inclusion

What are SBD forms in a South African tender?

A supplier guide to South African Standard Bidding Documents, declarations, signatures, consistency checks and tender submission readiness.

Tenders, B-BBEE and inclusion

How does a supplier register on the CSD?

A practical guide to Central Supplier Database registration in South Africa, including supplier details, banking records, tax status and ongoing updates.

Get in touch