Energy-as-a-service for African facilities: replacing upfront capex

Energy-as-a-service lets a facility use solar, batteries or efficiency upgrades without buying them. A provider funds, installs, owns and maintains the system, and the site pays per kWh or a fixed fee. It replaces capex with an operating cost. In South Africa, check NERSA registration, municipal approval and, for sectional title, STSMA resolutions.

By the Dev 360 teamSouth African context
Technician in a safety harness inspecting solar panels on the roof of a sectional title complex

Key takeaways

  • The provider owns and maintains the asset; the site pays for output
  • Contracts usually run 10 to 20 years, so terms matter
  • Grid-tied systems need municipal approval; larger ones need NERSA registration
  • About 600 million Africans still lack electricity

How it works

  1. The provider assesses the site and designs the system.
  2. It funds, installs, owns, insures and maintains it.
  3. The site pays per kWh generated, or a fixed monthly fee.
  4. At the end of the term the site renews, buys the system or has it removed.

Contract terms that matter

  • Tariff and escalation, compared with the utility tariff
  • Performance guarantees and what happens if output falls short
  • Term, early termination and buy-out values
  • Roof or land access, insurance and removal
  • Who holds the municipal and NERSA registrations

South African rules

NERSA distinguishes grid-connected systems of 100 kW or less, which register with the distributor (usually the municipality), from larger systems, which generally register with NERSA. All electrical work needs a Certificate of Compliance. Selling power to third parties raises separate licensing and municipal questions.

In sectional title

A roof lease or power agreement on common property needs the right resolutions. See rooftop solar energy-as-a-service for sectional title.

The bigger picture

The IEA estimates about 600 million Africans lack electricity access. Mission 300, launched by the World Bank and AfDB in 2024, aims to connect 300 million people by 2030.

Sources

Check each source’s current version before acting.

Important. Savings are estimates, never guarantees. Mention STSMA resolutions and NERSA rules before any sectional title project.

See also: Energy as a Service.

Short answers

What is energy-as-a-service?

Energy-as-a-service lets a site use provider-owned energy equipment without buying it. The provider funds, installs and maintains solar or batteries, while the site pays for energy or a fixed service fee. In South Africa, check municipal and NERSA requirements.

Does a rooftop solar system in South Africa need NERSA registration?

Not always. In South Africa, grid-connected systems of 100 kW or less register with the distributor, usually the municipality; larger systems generally register with NERSA. Electrical work also requires a Certificate of Compliance, so confirm the applicable route before connecting a system.

Can a body corporate sign an energy-as-a-service contract?

Yes, if the body corporate obtains the approvals that apply to the proposed project. A roof lease or improvement on common property may require resolutions under the STSMA and PMR 29, as well as municipal approval for a South African grid-connected installation.