Dev 360
Dev 360 capability

PPP participant · Construction and trades

Building and civil capability

Building, civil works and project coordination.

Building, civil works and project coordination. Dev 360 can discuss a suitable specialist for a defined need. Current capacity, credentials and appointment are confirmed through a conversation with Dev 360.

  • ProfileCapability category
  • IntroductionsPermission-based
  • ScopeConfirmed in writing

Find Building and civil capability online:Website ↗

Graded roads on a construction site
Illustrative image
Identity
Shared privately
Appointment
Agreed in writing
Evidence
Checked for scope

Capability, not a public participant profile

About this capability

Building, civil works and project coordination. This page describes a capability category, not a named provider or a verified credential held by Dev 360.

Specialist identity, capacity and appointment are discussed privately with the relevant permission. Professional registrations, insurance, references and project-specific suitability must be checked before appointment.

Track record

Inclusion and development

Inclusion is part of how Building and civil capability builds, not an add-on.

Diverse abilities

A team that includes people of diverse abilities and skill sets, as stated by the company.

Youth and internships

Internship and youth-development programmes that bring new people into construction.

Enterprise development

Reported support through a major bank’s enterprise development programme, and recognition at an inclusive-excellence awards event in 2026.

Project details as published by Building and civil capability; Dev 360 has not verified completion records.

Thrive: inclusion and disability upliftment →

Outsource through Dev 360

What Building and civil capability does

10 services, scoped by Dev 360 in writing and delivered by Building and civil capability.

Construction design

Turnkey planning from concept to completion, integrating electrical, mechanical and fire-protection systems into one design.

Building construction

New builds, alterations, renovations and refurbishment of commercial, industrial and residential buildings.

Civil works

Civil construction, external works, paving, fencing and site services.

Electrical and mechanical works

Electrical installations, HVAC, extraction systems and kitchen canopies.

Fire detection and suppression

Design, installation and upgrading of fire detection and suppression systems.

Asbestos works

Safe removal, handling and disposal of asbestos, by a registered asbestos contractor where the work requires it.

Solar energy and UPS systems

Design, installation and maintenance of solar PV and uninterruptible power supply systems.

Project management

One accountable team managing programme, trades and handover on construction projects.

Property valuation

Assessments of land and buildings for investment, development or sale decisions.

Furniture removal and site preparation

Safe relocation and disposal of furniture and contents ahead of renovation work.

How it works

Ways to work with Building and civil capability

How outsourcing through Dev 360 works →

  1. Outsourced through Dev 360One written scope, one quote in rand, one point of contact.
  2. Part of a Dev 360 projectNamed in the proposal, with responsibilities set out.
  3. Direct introductionDev 360 introduces you and steps back.

When to call

Signs you need a construction lead

  • A refurbishment needs building, M&E and fire work on one programme
  • Asbestos must be removed before renovation or demolition
  • Fire detection or suppression needs upgrading for compliance
  • A facility needs solar or UPS alongside building works
  • A multi-year maintenance contract needs a construction lead

Before you appoint Building and civil capability

  • CIDB grading confirmed for the class and value of work
  • Registered asbestos contractor for type 2 or type 3 asbestos work
  • Fire systems designed and installed to the applicable SANS standards
  • Valuations signed by a registered professional valuer where required
  • Public liability insurance, scope and quote in rand in writing

Registrations and credentials

  • Master Builders Association North member, as stated by the company
  • CIDB 6GB, 6ME, 5CE, 5EP, 5SO and 4SF (CRS 10206806, active to September 2029)

Guides and checklists

Read before you appoint

Sources

Check each source’s current version before acting.

Questions about this capability

What can this capability cover?

This capability area covers building, civil works and project coordination. The relevant specialist, availability, scope and responsibilities are confirmed for each enquiry; this page is not an appointment.

How is a suitable specialist considered?

Dev 360 discusses the need, relevant experience, professional requirements and availability. Any introduction is permission-based. Buyers should check the evidence relevant to the actual appointment.

Who contracts for the work?

The written proposal identifies the contracting parties, scope, fees and responsibilities. Regulated advice and professional sign-off remain with the appropriately qualified person or firm.

Can I request provider details?

Suitable provider details may be shared privately for a specific, permission-based conversation. Dev 360 does not publish a participant register.

Does this page guarantee work or an outcome?

No. A capability description is not a promise of availability, an appointment, funding, approval or a result. Each party decides whether to proceed on agreed written terms.

More in construction, maintenance and trades

Dev 360 capability
National

Electrical capability

Your reliable electrical contractor.

Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Dev 360 capability
National

Plumbing and maintenance

Precision plumbing. Expert construction.

Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Dev 360 capability
Johannesburg

Building and finishes practice

Building and finishing trades, one crew.

Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling

Dev 360 capability
Gauteng

Ultimate Concepts and Solutions

Solutions provider to the shopfitting and furniture manufacturing industry.

Services: Shopfitting and interiors · Furniture and joinery · Property condition assessments · Remedial scopes and BOQs · Maintenance and upgrades · Coatings and surface repairs

Answers to the questions people ask before they appoint.

Request a quote or introduction

Work with Building and civil capability through Dev 360

A few lines is enough.

Every enquiry is read by a person and answered by email.

We use these details to respond to your enquiry. Please do not include ID numbers, banking, health or other sensitive personal information. Our service providers, some outside South Africa, process it for us under agreements that protect it. See the privacy policy.

Get in touch