Hiring EV charging installers for a sectional title scheme
Hiring EV charging installers? Trustees should use a registered electrical contractor and confirm supply capacity and load management with the municipality.
Energy and utilities
A complex should assess available electrical capacity, charger locations, cable routes, access control, billing and future demand before installing electric vehicle chargers. Trustees should identify whether chargers affect common property or individual units and follow the scheme’s approval process. A qualified designer should coordinate electrical protection, load management, fire considerations and distributor requirements before any installation begins.

Ask residents about current and expected charging needs, parking arrangements and likely usage times. A qualified electrical professional should review the supply capacity, distribution boards, cable routes, protection and potential impact on other building loads. Load management may allow chargers to share available capacity, but the design should state what happens when demand is high. Do not rely on a simple count of parking bays to size the system.
Determine whether chargers will be shared, assigned to units or operated through a service provider. Trustees should check the scheme’s authority and approval process for work on common property, then document installation rights, access, maintenance, insurance and removal. Set out how electricity is measured and recovered, how users are identified, what fees apply and how disputes are handled. Explain the approach to owners before procurement so that operational and cost questions are visible.
Choose equipment and installation arrangements suited to the parking environment, with clear emergency procedures and competent installation. Confirm any applicable electrical, building, fire and distributor requirements. Consider conduits and capacity for future chargers while avoiding unnecessary initial expenditure. Keep drawings, commissioning records and service instructions. Dev 360’s body corporate interventions can support trustees coordinating complex building decisions and supplier scope.
Check each source’s current version before acting.
Not without checking the scheme’s rules, property rights, electrical design and approval process. Chargers can affect common property, supply capacity and other residents, so obtain written approval and technical review before installation.
Often a staged approach can be considered, if the electrical design allows for safe expansion. Plan capacity, cable routes, load management and common-property access from the start.
Hiring EV charging installers? Trustees should use a registered electrical contractor and confirm supply capacity and load management with the municipality.
Who pays for generators, inverters, batteries and water tanks in a sectional title complex, and which resolutions PMR 29 requires before installation.
How trustees can assess water, electricity, backup power and other infrastructure issues in a complex, and when to bring in registered specialists.
Talk to Dev 360