Affordable-housing build, Gauteng
A brickwork subcontract package on an active residential build.

PPP participant · Construction and trades
Building work, refurbishment and finishes.
Building work, refurbishment and finishes. Dev 360 can discuss a suitable specialist for a defined need. Current capacity, credentials and appointment are confirmed through a conversation with Dev 360.

Capability, not a public participant profile
Building work, refurbishment and finishes. This page describes a capability category, not a named provider or a verified credential held by Dev 360.
Specialist identity, capacity and appointment are discussed privately with the relevant permission. Professional registrations, insurance, references and project-specific suitability must be checked before appointment.
Track record
A brickwork subcontract package on an active residential build.
A previous government-school project delivered with a team of 24.
Outsource through Dev 360
6 services, scoped by Dev 360 in writing and delivered by Building and finishes practice.
General building packages as a main or trade subcontractor.
Load-bearing and infill brickwork for new builds and extensions.
Internal and external plaster for new and refurbished buildings.
Interior and exterior painting for builds, maintenance and refurbishments.
Floor and wall tiling for residential and commercial spaces.
Ceilings, bulkheads and drywall partitions.
When to call
As published by the business. Check current status with the issuing body.
Guides and checklists
Hiring painting contractors? Trustees should check product suitability and data sheets, and how old paint will be prepared and disposed of.
Hiring flooring and tiling contractors? Trustees should check the installer's competence and product suitability for traffic, wet areas and slip risk.
Hiring maintenance contractors? Trustees should check COIDA good standing, public liability cover and a section 37(2) mandatary agreement.
Why small South African contractors struggle to reach quality work alone, and how panels, teaming and mentorship help them grow without guaranteed…
Turnkey delivery versus appointing separate contractors: accountability, control, risk, cost and programme, and which suits which kind of project.
Is a three-quote rule legally required for body corporates? What the STSMA and PMRs require on conflicts, contracts and signatures, plus a fair…
Check each source’s current version before acting.
This capability area covers building work, refurbishment and finishes. The relevant specialist, availability, scope and responsibilities are confirmed for each enquiry; this page is not an appointment.
Dev 360 discusses the need, relevant experience, professional requirements and availability. Any introduction is permission-based. Buyers should check the evidence relevant to the actual appointment.
The written proposal identifies the contracting parties, scope, fees and responsibilities. Regulated advice and professional sign-off remain with the appropriately qualified person or firm.
Suitable provider details may be shared privately for a specific, permission-based conversation. Dev 360 does not publish a participant register.
No. A capability description is not a promise of availability, an appointment, funding, approval or a result. Each party decides whether to proceed on agreed written terms.

Your reliable electrical contractor.
Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Precision plumbing. Expert construction.
Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Solutions provider to the shopfitting and furniture manufacturing industry.
Services: Shopfitting and interiors · Furniture and joinery · Property condition assessments · Remedial scopes and BOQs · Maintenance and upgrades · Coatings and surface repairs

Shaping spaces, enabling dreams.
Services: Construction design · Building construction · Civil works · Electrical and mechanical works · Fire detection and suppression · Asbestos works · Solar energy and UPS systems · Project management · Property valuation · Furniture removal and site preparation
Request a quote or introduction
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360