Dev 360

Design and architecture

Is design and build better than traditional procurement?

Neither design and build nor traditional procurement is automatically better for every project. Design and build can bring design and construction coordination under one contractual route, while traditional procurement usually keeps the client’s design team separate from the contractor. Compare control, design development, risk allocation, tender information and change processes before choosing. Dev 360 can discuss architecture and commercial turnkey delivery, but each project needs a clearly defined appointment.

By the Dev 360 teamNovember 2026South African context
A project team reviewing design and construction information

Key takeaways

  • Choose based on project priorities
  • Compare responsibility and risk allocation
  • Protect design review and quality checks
  • Define scope before procurement

Understand the route before tender

In a traditional route, the client commonly appoints designers to develop information before appointing a contractor. In design and build, a contractor may take responsibility for completing design and construction to the agreed brief and requirements. Actual contracts vary, so labels alone are not enough. Identify who appoints each consultant, who coordinates the design and which party carries responsibility for design changes or performance requirements.

Compare control, time and cost certainty

A more developed design before tender can help clients assess proposals against a defined solution, but it takes time and requires coordinated information. Design and build may allow earlier contractor involvement and integrated coordination, while requiring a strong brief and clear performance requirements. Neither route guarantees savings, quicker completion or a fixed outcome. Review how changes, provisional items, quality standards and programme risks are managed.

Keep design quality visible

Regardless of route, state the design objectives, material expectations, review points and approval authority. Consider who checks compliance, coordinates specialist inputs and resolves disagreements. An architect’s role and professional duties should be clear in the contract. Dev 360 offers Architecture through Architecture and planning and commercial turnkey projects. Request a project-specific explanation of which delivery responsibilities each service includes. Document the selected route and review points before appointment.

Short answers

Does design and build always cost less?

No. Cost depends on the brief, procurement, market, design choices, risk and contract management. Compare complete proposals rather than assuming a delivery label predicts savings.

Can I appoint my own architect under design and build?

It depends on the chosen contract and responsibilities. Clarify whether the architect is appointed by the client or contractor and how design reviews will work.

Which route gives more client control?

Traditional procurement can preserve direct client appointments to designers, but control also depends on the contract, decision process and quality of the brief

Design and architecture

Architecture

Dev 360 Architecture with Architecture and planning: building design, municipal submission drawings, refurbishment and adaptive reuse in Gauteng.

Design and architecture

Commercial turnkey projects

Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.

Get in touch