Before hiring pool contractors, trustees should check barrier requirements, municipal approval and electrical work. At handover, insist on a barrier inspection, electrical Certificate of Compliance and commissioning records. The key standard here is SANS 10400-D. A common mistake: gates that don't self-close.

Start with the six baseline checks that apply to every contractor. Because swimming pools is a major capital item, it also belongs in the 10-year maintenance plan.
Check each source’s current version before acting.
Important. Generic guidance for swimming pools. Confirm the current municipal rules for your site.
Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.
SANS 10400-D calls for a pool barrier, such as a wall or fence, with a self-closing, self-latching gate. Trustees should check the current South African standard and municipal by-law for the particular complex before approving or accepting the barrier.
The pool handover should include a barrier inspection or municipal approval, an electrical Certificate of Compliance, and pump, filter and chemical start-up records. Keep these with scheme documents and confirm the South African safety and local by-law requirements have been addressed.
Gates that fail to self-close and chemicals stored near pump motors are avoidable pool hazards. Trustees should inspect the barrier and chemical storage, and check the applicable SANS 10400-D and municipal requirements.
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Hiring landscapers? Trustees should check water restrictions, irrigation rules and invasive-species obligations.
Hiring cleaning contractors? Trustees should check COIDA registration and compliance with contract-cleaning wage rules.
Talk to Dev 360