Architecture
Dev 360 Architecture with Architecture and planning: building design, municipal submission drawings, refurbishment and adaptive reuse in Gauteng.
Design and architecture
In short
A sectional title owner should not assume that an exclusive use area can be built on or enclosed without further consent. An extension may affect common property, sectional plans, scheme governance and municipal approvals. Check the title and registered plans, obtain the required body corporate or owner approvals, and consult suitable professionals before work begins. The exact pathway depends on the scheme documents, proposal and applicable law.

Review the sectional plan, title information, conduct and management rules, and any recorded exclusive use rights. An exclusive use area gives a specified owner a use right, but it does not automatically make that space a separately owned building area or grant permission to construct. Check whether the proposed work changes boundaries, affects common property or alters the scheme’s registered information.
Ask the body corporate or managing agent which approvals and documents are required. Depending on the work, owner resolutions, consent, amended sectional plans or other steps may be needed. Separately check municipal planning and building requirements with the relevant authority. Do not begin based only on informal approval from a neighbour or trustee. Obtain written decisions and professional advice before ordering work or changing the building.
Have suitably qualified professionals assess structural, waterproofing, fire and service implications relevant to the proposal. Keep the approved drawings, consents and any updated scheme records with the property file. The Architecture service can be discussed with Architecture and planning, while Dev 360 also supports body corporate interventions. Scheme-specific legal questions should be referred to an appropriate adviser. Check the applicable scheme documents before any work begins.
Not necessarily. Exclusive use is a defined right under the scheme arrangements; check the registered plans, title and applicable rules to understand the particular right.
Do not rely on an informal conversation. Confirm the resolutions and consents required under the scheme documents and applicable law, and retain written records
They may. Check building and planning requirements with the relevant municipality for the specific proposal, separately from scheme approvals Confirm this before work starts
Dev 360 Architecture with Architecture and planning: building design, municipal submission drawings, refurbishment and adaptive reuse in Gauteng.
Help for trustees and managing agents with maintenance backlogs, failing infrastructure, utility costs and scheme pressure, under a written trustee mandate.
Building plan approval involves preparing an application, submitting it to the municipality and responding to comments. Understand the usual building-plan submission stages and responses to municipal comments.
Published by Dev 360, led by Hannes Dupper, Director · In the press
Talk to Dev 360