Backup power and water for complexes: who pays and who approves?
Who pays for generators, inverters, batteries and water tanks in a sectional title complex, and which resolutions PMR 29 requires before installation.
Energy and utilities
A business can plan for load shedding and grid instability by identifying critical operations, estimating outage impacts, assigning response roles and testing suitable backup options. The plan should address power interruptions, voltage events, fuel or battery availability, communications and safe shutdown. Review it when equipment, operating hours or outage patterns change, and keep a record of lessons from real events and scheduled tests.

List processes that cannot stop, systems that can pause safely and services that need an orderly shutdown. Consider access control, alarms, communications, refrigeration, pumps, data, production and customer commitments. Record dependencies such as internet connectivity, fuel delivery and staff availability. Estimate the impact of a short interruption and a longer event, then agree who can make operational decisions and how staff and customers will be informed.
Options can include demand reduction, backup generators, batteries, solar, uninterruptible power supplies or operational rescheduling. Each solves a different problem and has limits. Check power quality, starting demand, charging or fuel availability, safe changeover, ventilation, maintenance and noise. Do not assume backup equipment protects every circuit or can run indefinitely. Document the circuits covered, expected operating period and conditions under which the system should be shut down.
Run controlled tests that confirm staff know the procedure, equipment starts correctly and critical systems recover as intended. Record faults, runtime, fuel or battery status and supplier response. Review the plan after a site change, a significant outage or an incident. For building owners, include communication with occupants and contractors. Dev 360 can coordinate a wider property or commercial response through its commercial project service.
The choice depends on the loads, outage duration, noise constraints, fuel availability, charging options and operating requirements. Compare the options against a measured load profile and consider whether a combined approach is appropriate.
No. A grid-connected solar system may shut down during a grid outage unless configured with suitable controls and storage. Confirm which circuits remain powered and for how long.
Set a regular schedule based on operational risk and equipment requirements, and test after material changes. Record results and update procedures when tests identify gaps.
Who pays for generators, inverters, batteries and water tanks in a sectional title complex, and which resolutions PMR 29 requires before installation.
A South African generator safety checklist covering placement, ventilation, noise, fuel storage, electrical changeover and maintenance for buildings.
Battery storage sizing basics for South African buildings: estimate critical loads, backup duration, usable capacity, inverter power and operating needs.