Africa’s infrastructure gap is a preparation problem as much as a money problem
Africa needs USD 130 to 170bn a year for infrastructure. Why projects stall before financial close, and what works in roads, energy, water and data.
Africa and infrastructure
In short
Factories, ports, banks and logistics firms now run on data, so fibre and broadband are as basic as roads and power. ITU estimates that 38% of Africa's population used the internet in 2024, against 68% globally. World Bank work citing ITU modelling estimates that a 10% rise in mobile broadband penetration lifts GDP per capita in Africa by about 2.5%.

PIDA treats ICT as one of four infrastructure sectors and plans fibre along transport and power corridors. Laying ducts during road works is far cheaper than digging twice.
Fibre access in estates and sectional title schemes needs wayleave or landlord access agreements and the right resolutions. See the telecoms and connectivity spotlight.
Check each source’s current version before acting.
It can, but the reported figure is an estimate rather than a guaranteed result. World Bank work citing ITU modelling associates a 10% increase in mobile broadband penetration with about 2.5% higher GDP per capita in Africa. That econometric relationship does not predict the outcome for every country.
Fibre supports manufacturing because automation, quality systems, supply-chain tracking and cloud services all depend on reliable, low-latency connections. For African industrial sites, planning fibre alongside roads and power can support production and logistics without treating connectivity as an optional extra.
Africa needs USD 130 to 170bn a year for infrastructure. Why projects stall before financial close, and what works in roads, energy, water and data.
Africa has about 237 special economic zones and South Africa has 11. How industrial parks can build local supplier ecosystems rather than isolated…
How to write skills transfer and local participation into infrastructure contracts so they are measurable, lawful and enforceable, including PPR 2022.
Published by Dev 360, led by Hannes Dupper, Director · In the press
Talk to Dev 360