What approval does a tenant need before a fit-out?

A tenant should review its lease and obtain the landlord’s required written approval before altering a commercial space. Approval may cover drawings, contractors, work hours, services, insurance, access, deposits and reinstatement. Building rules and statutory approvals may also apply. Confirm each requirement with the landlord or managing agent and qualified project advisers before ordering or starting work.

By the Dev 360 teamNovember 2026South African context
Read the lease before designing in a South African property or business setting

Key takeaways

  • Review lease and building rules
  • Submit coordinated drawings and method details
  • Confirm access, services and insurance requirements
  • Record reinstatement and handover obligations

Read the lease before designing

Lease provisions may regulate alterations, signage, building services, noise, contractors, insurance and reinstatement at lease end. Check whether consent is needed for design development, construction or both. Ask the landlord for the current fit-out guide and submission checklist. Resolve who pays for reviews, service isolations or building protection before pricing. A tenant should not rely on a verbal indication when the lease or building rules require written consent.

Submit a complete approval package

The landlord may ask for coordinated layouts, finishes, services information, contractor details, construction programme, risk controls and evidence of insurance. Provide enough time for review and respond to comments through controlled drawing revisions. Landlord approval does not replace municipal approvals or professional duties. If the project changes after consent, confirm whether revised approval is needed before carrying out the affected work.

Plan occupation and reinstatement together

Agree procedures for deliveries, after-hours access, waste removal, hot works, keys and service interruptions. Before construction, document the existing condition of the premises and common areas to reduce later disagreement. Clarify the end-of-lease reinstatement standard, including which approved improvements may remain. Keep approvals, inspections, certificates and handover records with the lease file. Clear written requirements help both parties manage the fit-out without treating landlord consent as a substitute for legal compliance.

Short answers

Does landlord approval replace municipal approval?

No. Landlord consent and statutory approvals are separate. Confirm both processes with the landlord and the relevant authority or project professional before work starts.

Can the landlord choose the tenant’s contractor?

The lease and building procedures may set contractor requirements or approval conditions. Review the actual documents and obtain clarification in writing instead of assuming a particular selection right.

Should reinstatement be discussed before construction?

Yes. Establish the required end-of-lease condition before approving the works, and record which alterations may remain. This reduces uncertainty when the tenant eventually vacates.