Dev 360

Body corporates and sectional title

Sectional title systemic degradation: why complexes decline and how trustees reverse it

Sectional title schemes rarely fail from one cause. Deferred maintenance, levy arrears, under-insurance and unreliable municipal services feed each other until a roof, lift or pipe failure exposes the backlog. South African law already gives trustees the tools to break the cycle: a funded reserve, a 10-year maintenance plan, replacement-value insurance and honest reporting to owners.

By Hannes Dupper, Director · hannesdupper.comNovember 2026South African context
Ageing sectional title complex with maintenance work under way
15,587new CSOS dispute applications in 2023/24, up from 11,306
62.5%of those disputes were financial, led by levy arrears
162 of 257municipalities in financial distress in 2023/24
3% vs 8%of asset value spent on municipal maintenance, against the 8% guideline

Key takeaways

  • Degradation is a system: maintenance, money, insurance and municipal services fail together
  • The Act already requires an administrative fund, a reserve fund, a 10-year plan and replacement-value insurance
  • Financial disputes dominate CSOS caseloads, so arrears control is a maintenance issue
  • Age alone does not doom a scheme; neglect and poor governance do

A cycle, not an event

Most complexes do not decline because of one bad decision. They decline because a small backlog is allowed to compound. Maintenance is deferred to keep levies low; deferred work becomes more expensive repair; repair is funded by special levies; special levies push more owners into arrears; and arrears starve the budget for the next round of maintenance. Each turn of the cycle makes the next one harder to stop.

The signs are measurable. The Community Schemes Ombud Service received 15,587 new dispute applications in 2023/24, up from 11,306 the year before, and 9,742 of them were financial, with levy arrears and interest on arrears dominating.

What the law already requires

The Sectional Titles Schemes Management Act requires every body corporate to keep an administrative fund reasonably sufficient for running costs and a reserve fund reasonably sufficient for future maintenance and repair of the common property (section 3(1)). The regulations add teeth:

  • Reserve minimums (Regulation 2). If the reserve fund is below 25% of the previous year’s administrative contributions, the budgeted reserve contribution must be at least 15% of the administrative budget. Between 25% and 100%, it must at least match the budget for common-property repairs and maintenance.
  • A 10-year maintenance, repair and replacement plan (PMR 22). Major capital items, their condition, when work is expected, what it will cost and their expected life, reported on at every AGM.
  • Replacement-value insurance (section 3(1)(h) and PMR 23). Buildings insured for what it would cost to rebuild them, with a replacement valuation at least every three years.

A scheme that follows these rules honestly has an early-warning system built in. A scheme that treats them as paperwork loses it.

The municipal layer trustees cannot ignore

Complexes sit on municipal networks that are under strain. National Treasury reported 162 of 257 municipalities in financial distress in 2023/24, with metro water losses averaging 34.6% and electricity losses 20.9% in 2024, far above the benchmarks. The Auditor-General found municipalities spent about 3% of the value of their infrastructure on maintenance, against a recommended 8%, and that more than half of the audited projects were delayed. For trustees, that means planning for outages, pressure problems and failures at the boundary, not only inside it.

Age is not the enemy

Older stock is not automatically failing stock. Lightstone found sectional units aged 30 to 39 years grew in value by an average of 4.7% a year over a decade, ahead of units aged 20 to 29. What separates schemes that hold their value from those that slide is governance: whether the maintenance is planned, funded and done.

A recovery model: condition, cash, compliance, confidence

  1. Condition. Inspect and score the common property, so the backlog is a list, not a feeling.
  2. Cash. Cost and phase the 10-year plan, and connect levies, the reserve fund and arrears recovery to it.
  3. Compliance. Bring the reserve, insurance valuation and records into line with the Act and regulations.
  4. Communication. Report progress to owners in plain language at every AGM and in between.
  5. Confidence. Buyers, lenders and insurers respond to schemes that can show their numbers.

Five questions for your next AGM

  • When was the 10-year maintenance plan last updated, and what is the most urgent item on it?
  • Does the reserve contribution meet the Regulation 2 minimum for our reserve level?
  • When was the last replacement valuation for insurance?
  • What share of levies is in arrears, and what is the recovery plan?
  • What happens to the complex if municipal water or power fails for a week?

This article is general information, not legal, financial, engineering or investment advice. Figures are taken from the sources listed below for the periods they report.

See also: About Dev 360.

Through the PPP

Participants who deliver this

These PPP participants deliver this kind of work.

Dev 360 capability
Building materials and coatings

Protective coatings supplier

Don't just cover the problem, solve it smarter.

Services: Waterproofing and water repellency · Rising-damp treatment · Stone protection · Timber protection · Masonry and exterior paints · Heat-reflective roof coatings · Photocatalytic mineral coating · Primers and cement additives · Cleaning and restoration

Dev 360 capability
Construction and trades

Plumbing and maintenance

Precision plumbing. Expert construction.

Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Not a guarantee of work. All participants

Short answers

How much must a sectional title reserve fund have?

The required contribution depends on the reserve level. Below 25% of the previous year’s administrative contributions, the budgeted contribution must be at least 15% of the administrative budget; between 25% and 100% it must match repairs and maintenance, and at 100% or more no minimum is prescribed under South African Regulation 2.

What is a 10-year maintenance plan in sectional title?

A PMR 22 plan lists major items due for maintenance, repair or replacement during the next 10 years. It records condition, timing, cost and expected life, and South African trustees report on it at each AGM.

How often must sectional title buildings be valued for insurance?

At least every three years. PMR 23 requires the body corporate to insure buildings for replacement value and obtain a replacement valuation at least every three years, presenting it at the AGM under South African sectional title rules.

What happens when owners do not pay levies?

The body corporate should recover unpaid levies under its rules and arrears policy, which may include payment plans, interest, legal action or a CSOS application. Uncollected contributions reduce maintenance funds for the South African scheme.

Can CSOS help with levy arrears?

Yes. CSOS hears financial disputes, including disputes about contributions and arrears, and financial matters make up most of its caseload according to this page. A scheme may seek an order through the CSOS process where appropriate.

Do older complexes always lose value?

No. The page cites Lightstone data showing that older sectional units can still grow in value; age alone does not determine performance. Planned, funded maintenance and good governance matter for South African schemes, though no outcome is guaranteed.

Enquire about participation

Introduce your business

A few lines is enough.

Every enquiry is read by a person and answered by email.

We use these details to respond to your enquiry. Please do not include ID numbers, banking, health or other sensitive personal information. Our service providers, some outside South Africa, process it for us under agreements that protect it. See the privacy policy.

Get in touch