Dev 360

Specialist trades · PPP spotlight

Hiring maintenance contractors for a sectional title scheme

Before hiring maintenance contractors, trustees should check COIDA good standing, public liability cover and a section 37(2) mandatary agreement. At handover, insist on a COIDA letter, signed mandatary agreement and completion report. The key standard here is OHS Act section 37(2).

By the Dev 360 teamSouth African context
Project manager and contractor reviewing drawings in an office fit-out

Key takeaways

  • COIDA letter of good standing
  • At handover: cOIDA letter
  • OHS Act section 37(2)
  • Also check: COIDA

What to check before you appoint

  • COIDA letter of good standing
  • Public liability insurance
  • OHS section 37(2) mandatary agreement
  • Clear call-out rates and response times

What to ask for at handover

  • COIDA letter
  • Signed mandatary agreement
  • Completion and handover report

Rules and standards that apply

  • OHS Act section 37(2)
  • COIDA
  • Construction Regulations for construction work

Common mistakes

  • Handymen without COIDA cover
  • Work done with no written scope

Baseline checks

Start with the six baseline checks that apply to every contractor. Because general maintenance is a major capital item, it also belongs in the 10-year maintenance plan.

Sources

Check each source’s current version before acting.

Important. Generic guidance for general maintenance. Confirm the current municipal rules for your site.

Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.

See also: The construction, maintenance and trades service line.

Through the PPP

Participants who deliver this

Dev 360 can outsource general maintenance work to these participants, or introduce you.

Dev 360 capability
Construction and trades

Plumbing and maintenance

Precision plumbing. Expert construction.

Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Dev 360 capability
Construction and trades

Building and finishes practice

Building and finishing trades, one crew.

Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling

Dev 360 capability
Building materials and coatings

Protective coatings supplier

Don't just cover the problem, solve it smarter.

Services: Waterproofing and water repellency · Rising-damp treatment · Stone protection · Timber protection · Masonry and exterior paints · Heat-reflective roof coatings · Photocatalytic mineral coating · Primers and cement additives · Cleaning and restoration

Not a guarantee of work. All participants

Short answers

Do maintenance contractors in a complex need CIDB grading?

Generally, no. CIDB grading applies to public-sector construction procurement, not as a general requirement for private body corporates. Trustees should still check the contractor’s relevant compliance documents and any conditions that apply to the specific project.

What should trustees get at handover for general maintenance?

For general maintenance, obtain the contractor’s COIDA letter, the signed OHS Act section 37(2) mandatary agreement, and a completion and handover report. Keep the paperwork with scheme records so the South African body corporate can document its contractor and safety arrangements.

Where do schemes go wrong with general maintenance?

Schemes risk appointing handymen without COIDA cover or commissioning work without a written scope. In South Africa, trustees should confirm the contractor’s Compensation Fund standing and agree the work, call-out rates and responsibilities in writing before work starts.