Why body corporate maintenance backlogs grow
Why maintenance backlogs build up in sectional title schemes, what they cost owners over time, and practical first steps trustees can take.
Body corporates and sectional title
Trustees should rank maintenance by four tests: safety first, then legal compliance, then the risk of further damage, then cost and value. Scoring every item against the same tests turns a long list of complaints into a defensible plan owners can support.

Gather every known issue in one place: the maintenance plan, owner complaints, managing agent reports and a walk-through of the property. Record the location, a photo and a short description for each item.
| Test | Question |
|---|---|
| Safety | Could this injure someone? Think electrical faults, loose balustrades, broken paving, failed lighting. |
| Compliance | Does a law, by-law, insurer or the scheme rules require it? Fire equipment, lifts and electrical compliance often fall here. |
| Damage risk | Will waiting cause further damage? Roof leaks and failed waterproofing usually do. |
| Cost and value | What will it cost now versus later, and what does it protect? |
Items that fail the safety or compliance test go into the first group regardless of cost. Items with high damage risk come next. Cosmetic work and upgrades follow once the essentials are funded. This order protects people first, then the building, then appearance.
Attach realistic costs and a timeline to each group, show how it will be funded from levies and reserves, and present the scoring at a meeting. Owners are far more likely to approve a plan when they can see why each item is where it is.
Check each source’s current version before acting.
Safety and legal-compliance work should lead, followed by items likely to cause more damage if delayed, such as roof leaks or failed waterproofing. Cosmetic work comes later; South African trustees can use the same criteria to order the maintenance list consistently.
Trustees can explain priorities by scoring every item against the same tests, showing the scores and costs, and describing how the plan will be funded. A transparent approach gives South African owners a clear basis for understanding the decisions.
Why maintenance backlogs build up in sectional title schemes, what they cost owners over time, and practical first steps trustees can take.
What the 10-year maintenance, repair and replacement plan is, what it should cover and how trustees keep it current.
How trustees can assess water, electricity, backup power and other infrastructure issues in a complex, and when to bring in specialists.
Talk to Dev 360