Sectional title reserve fund calculator: the Regulation 2 minimum

Regulation 2 sets a floor, not a target. If last year's closing reserve was below 25% of last year's admin-fund levies, this year's reserve contribution must be at least 15% of the admin budget. At 25% to 100%, it must at least match budgeted repairs and maintenance. At 100% or more, no minimum applies.

By the Dev 360 teamSouth African context
Maintenance worker inspecting the roof of a sectional title complex

Key takeaways

  • The minimum depends on last year's closing reserve compared with last year's admin-fund contributions
  • Three bands apply: below 25%, 25% to 100%, and 100% or more
  • The statutory minimum can still leave a scheme underfunded for its 10-year plan
  • The PMR 22 plan, not the minimum, should set the real contribution

Calculator

Regulation 2 minimum reserve contribution

Reserve ratio20%
BandBelow 25%
Minimum reserve contributionR33,000

Below 25%: the minimum is 15% of this year's admin-fund budget.

How Regulation 2 works

The Sectional Titles Schemes Management Act requires every body corporate to keep a reserve fund that is reasonably sufficient for future maintenance and repair of common property (section 3(1)(b)). Regulation 2 then sets the minimum yearly contribution, based on how the reserve stood at the end of the previous financial year:

  • Reserve below 25% of the previous year's total admin-fund contributions: contribute at least 15% of this year's budgeted admin-fund contributions.
  • Reserve between 25% and 100%: contribute at least the amount budgeted from the admin fund for common-property repairs and maintenance this year.
  • Reserve at 100% or more: no prescribed minimum.

The year budgeted at the first general meeting of a new scheme is excluded.

A worked example

Last year owners paid R200,000 into the admin fund and the reserve closed at R40,000. That is 20%, below the 25% threshold. If this year's admin budget is R220,000, the minimum reserve contribution is 15% × R220,000 = R33,000.

Why the minimum is rarely enough

The minimum is a legal floor. The 10-year maintenance, repair and replacement plan required by PMR 22 works out what each major item will really cost: (estimated cost minus what has already been set aside) divided by its expected life. Add those amounts up and many schemes find they need far more than the floor. Budget from the plan, and use the calculator only to check you are not below the law.

What trustees should record

  • The previous year's closing reserve and admin-fund contributions, from the audited financial statements
  • Which band applied and the resulting minimum
  • The plan-based contribution and why the budget uses it
  • The AGM resolution approving the budget

Sources

Check each source’s current version before acting.

Important. This calculator is educational. It shows the statutory minimum only and is not financial or legal advice. Confirm figures with your auditor and managing agent.

Short answers

Is the 15% reserve contribution always required?

No. The 15% minimum applies only when the previous year-end reserve was below 25% of that year’s admin-fund contributions. At 25% to 100%, the contribution must at least match budgeted repairs and maintenance; at 100% or more, no prescribed minimum applies under South African Regulation 2.

Can a small scheme skip the reserve fund?

No. South African Regulation 2 does not provide a small-scheme exemption. The stated exceptions are the budget approved at a new scheme’s first general meeting and schemes whose reserve already equals or exceeds 100% of the previous year’s admin-fund contributions.

Is the Regulation 2 minimum enough to fund the maintenance plan?

Often not. Regulation 2 sets a legal floor, while the PMR 22 maintenance plan estimates costs for major items over their remaining lives. South African trustees should use the plan to budget the actual reserve need, rather than assume the minimum will fund the work.