Dev 360

Dev 360 · Participants

The specialists behind the work

Participants are the vetted businesses and professionals on Dev 360’s Preferred Participation Panel (PPP), the specialists behind its projects. Through Dev 360 you can outsource electrical, plumbing, building, shopfitting, metering, coatings, design and architecture work, and be introduced to finance, legal, insurance and investment specialists, with one point of contact and a written scope.

Business professionals in conversation around a meeting table

Collective credentials

B-BBEE, disability and credentials

Level 1 B-BBEE, 100% disability-owned leadership, CIDB grades up to 6GB and 6ME, and ISO 9001, 14001 and 45001 across the panel.

Outsourced services

Choose a service line

Each service line shows what is covered, who delivers it and how Dev 360 coordinates the work.

Capability categories

Construction, maintenance and trades

Electrical capability, Plumbing and maintenance, Building and finishes practice, Ultimate Concepts and Solutions, Building and civil capability

Capability categories

Finance, legal and insurance

Community scheme finance capability, Legal services practice, Financial planning capability

Delivered by Dev 360

Digital services

Website design, social media, branding, SEO and AEO, CRM, AI and 3D visualisation, delivered by Dev 360 for clients and participants.

Directory

All participants

Specialist capability categories, grouped by field.

Construction and trades

Dev 360 capability
National

Electrical capability

Your reliable electrical contractor.

Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Dev 360 capability
National

Plumbing and maintenance

Precision plumbing. Expert construction.

Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Dev 360 capability
Johannesburg

Building and finishes practice

Building and finishing trades, one crew.

Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling

Dev 360 capability
Gauteng

Ultimate Concepts and Solutions

Solutions provider to the shopfitting and furniture manufacturing industry.

Services: Shopfitting and interiors · Furniture and joinery · Property condition assessments · Remedial scopes and BOQs · Maintenance and upgrades · Coatings and surface repairs

Dev 360 capability
Johannesburg

Building and civil capability

Shaping spaces, enabling dreams.

Services: Construction design · Building construction · Civil works · Electrical and mechanical works · Fire detection and suppression · Asbestos works · Solar energy and UPS systems · Project management · Property valuation · Furniture removal and site preparation

Technology and metering

Dev 360 capability
National

Utility metering capability

Smarter metering, billing automation and usage monitoring.

Services: Prepaid and smart sub-metering · Automated billing and arrears recovery · STS electricity vending · Tariff and time-of-use management · Monitoring and revenue protection · Remote utility control · Resident communication

Building materials and coatings

Dev 360 capability
Pan-African

Protective coatings supplier

Don't just cover the problem, solve it smarter.

Services: Waterproofing and water repellency · Rising-damp treatment · Stone protection · Timber protection · Masonry and exterior paints · Heat-reflective roof coatings · Photocatalytic mineral coating · Primers and cement additives · Cleaning and restoration

Design and architecture

Dev 360 capability
National

Architecture and planning

Architecture, planning and 3D design for Gauteng projects.

Services: Architectural design · Spatial planning · CAD documentation · 3D visualisation · Refurbishment and adaptive reuse · Engineering coordination

Finance, legal and insurance

Dev 360 capability
National

Community scheme finance capability

Community scheme finance.

Services: Loans and project finance · Levy finance and specialist collections · Unfinanced levy collection · Overdraft facility · Executive Managing Agent · Insurance · Equipment rental finance · Section 46 administration

Dev 360 capability
Gauteng

Legal services practice

Protecting what you build, own and create.

Services: Construction law · Conveyancing and notarial services · Intellectual property · Commercial law · Trusts and estates · General litigation

Dev 360 capability
Gauteng

Financial planning capability

We start with your life, not a financial product.

Services: Life and risk cover · Retirement planning · Savings and investments · Medical aid guidance · Business financial planning · Operating models for advisers · Central practice support

Investment and advisory

Dev 360 capability
Pan-African

Investment advisory capability

Strategic investment. Sustainable growth.

Services: Investment advisory · Corporate finance · Capital raising · Deal structuring · Project finance · M&A and transactions · Strategic advisory · Valuation and modelling · Investor readiness · Executive support

How it works

Three ways to use a participant

Model 1

Outsourced through Dev 360

Dev 360 scopes the work, brings in the participant as the delivery participant and stays your point of contact through delivery and handover. You get one written scope and one quote in rand.

Model 2

Part of a Dev 360 project

Inside a body corporate intervention or commercial project, the proposal names the participant, its responsibilities and who you contract with, before work starts.

Model 3

Direct introduction

Prefer to appoint directly? Dev 360 shares the brief, introduces you and steps back. You agree terms with the participant.

  1. Tell us the need

    Describe the work, the site and the timing.

  2. We confirm the fit

    Dev 360 checks the scope against the participant's services, coverage and availability.

  3. Scope in writing

    Scope, responsibilities, cost in rand and who you contract with are agreed before work starts.

  4. Delivery and handover

    Dev 360 coordinates, reports progress and hands over the documents.

Licensed services. Finance, credit, legal work, financial advice and investment advisory are not outsourced through Dev 360. The licensed participant advises and contracts with you directly; Dev 360 coordinates the brief and timing.

Why outsource through Dev 360

One scope. One contact. Specialists who fit.

  • Vetted PPP specialists matched to the job
  • Trades sequenced on one programme
  • Scope, cost in rand and contracting party agreed in writing
  • Compliance documents collected at handover
  • Progress reported to trustees, owners or management

For participants

Get found as well as referred

Every participant gets a profile page built for Google and AI assistants, linked from the service lines and industry spotlights. Participants can add website design, social media and digital footprint packages from Dev 360.

Join the PPP →

Short answers

What are Dev 360 participants?

Dev 360’s participants are specialist businesses in its Preferred Participation Panel, with design by a Dev 360 Associate. Dev 360 scopes and coordinates outsourced work; for licensed services, it introduces the provider and coordinates the brief and timing.

What can I outsource through Dev 360?

Through Dev 360, clients can outsource electrical, plumbing, building, finishing, shopfitting, metering, coatings, architecture and visualisation work. Dev 360 scopes the job, confirms the delivery participant and coordinates the work to handover; licensed services are introductions rather than outsourced advice.

How is this different from hiring a contractor directly?

Dev 360 provides one written scope and a single point of contact instead of leaving the client to coordinate every trade. It checks the paperwork, sequences the participant work and reports progress through handover; direct introductions follow a different arrangement.

Who do I contract with?

The proposal states who the client contracts with before work starts. For outsourced services, Dev 360 sets this out in writing; for finance, credit, legal, financial or investment advice, the licensed participant contracts directly with you.

Does Dev 360 guarantee participants’ work?

No. Dev 360 vets participants when they join and scopes and coordinates outsourced work, but it does not promise a participant’s work or outcome. The written scope and contracting party should be confirmed before the service begins.

How does a business become a participant?

A business starts with a suitability conversation and completes onboarding to Dev 360’s Preferred Participation Panel. Dev 360 can then provide a participant profile, and the business may add Dev 360 digital services for its own use.

Important. Profiles are based on each business's own public information and are published with its consent. Dev 360 does not guarantee any participant's work; appointments follow written scopes and your own checks.

Participants

Tell us what you need done

A few lines is enough.

Every enquiry is read by a person and answered by email.

We use these details to respond to your enquiry. Please do not include ID numbers, banking, health or other sensitive personal information. Our service providers, some outside South Africa, process it for us under agreements that protect it. See the privacy policy.

Get in touch