Architectural design
Concept to developed design for new and existing buildings.

PPP participant · Design and architecture
Architectural design, planning and visualisation.
Architectural design, planning and visualisation. Dev 360 can discuss a suitable specialist for a defined need. Current capacity, credentials and appointment are confirmed through a conversation with Dev 360.

Capability, not a public participant profile
Architectural design, planning and visualisation. This page describes a capability category, not a named provider or a verified credential held by Dev 360.
Specialist identity, capacity and appointment are discussed privately with the relevant permission. Professional registrations, insurance, references and project-specific suitability must be checked before appointment.
Outsource through Dev 360
6 services, scoped by Dev 360 in writing and delivered by Architecture and planning.
Concept to developed design for new and existing buildings.
Planning input for new builds, refurbishments and reuse.
Drawings for municipal submission, tender and construction.
Models and renders that show design intent.
Design for upgrading and repurposing existing buildings.
Design coordinated with structural, civil and services engineers.
When to call
Guides and checklists
Hiring architects and designers? Trustees should verify SACAP registration of the person submitting plans.
Hiring consulting engineers? Trustees should verify the engineer's ECSA registration in the right category.
Hiring structural and civil contractors? Trustees should verify the engineer's registration on the ECSA register.
The stages of township establishment in Gauteng, from feasibility and land-use application to services agreements, general plan and township register.
Why the delivery model now decides whether a South African development works: live feasibility, aligned participants, performance-linked contracts.
When a new home must be enrolled with the NHBRC, builder registration, the warranty periods and a checklist for entry-level housing developers.
Check each source’s current version before acting.
This capability area covers architectural design, planning and visualisation. The relevant specialist, availability, scope and responsibilities are confirmed for each enquiry; this page is not an appointment.
Dev 360 discusses the need, relevant experience, professional requirements and availability. Any introduction is permission-based. Buyers should check the evidence relevant to the actual appointment.
The written proposal identifies the contracting parties, scope, fees and responsibilities. Regulated advice and professional sign-off remain with the appropriately qualified person or firm.
Suitable provider details may be shared privately for a specific, permission-based conversation. Dev 360 does not publish a participant register.
No. A capability description is not a promise of availability, an appointment, funding, approval or a result. Each party decides whether to proceed on agreed written terms.

Your reliable electrical contractor.
Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Precision plumbing. Expert construction.
Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training
Request a quote or introduction
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360