Energy & power · PPP spotlight

Hiring EV charging installers for a sectional title scheme

Before hiring EV charging installers, trustees should use a registered electrical contractor and confirm supply capacity and load management with the municipality. At handover, insist on an electrical Certificate of Compliance and the charger commissioning report. The key standard here is Electrical Installation Regulations, 2009.

By the Dev 360 teamSouth African context
Technician in a safety harness inspecting solar panels on the roof of a sectional title complex

Key takeaways

  • Registered electrical contractor
  • At handover: electrical Certificate of Compliance
  • Electrical Installation Regulations, 2009
  • Also check: SANS 10142-1 and its EV-charging provisions

What to check before you appoint

  • Registered electrical contractor
  • Available supply capacity and load-management design
  • Municipal approval where supply changes
  • Who pays for charging, and how it is metered
  • PMR 29 resolution for common-property installation

What to ask for at handover

  • Electrical Certificate of Compliance
  • Charger commissioning and test report
  • Protection settings and load-management configuration

Rules and standards that apply

  • Electrical Installation Regulations, 2009
  • SANS 10142-1 and its EV-charging provisions
  • Municipal electricity rules

Common mistakes

  • Chargers that overload the supply
  • No metering, so owners subsidise EV users

Baseline checks

Start with the six baseline checks that apply to every contractor.

Sources

Check each source’s current version before acting.

Important. Generic guidance for EV infrastructure. Confirm the current municipal rules for your site.

Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.

Through the PPP

Participants who deliver this

Dev 360 can outsource ev infrastructure work to these participants, or introduce you.

Dev 360 capability
Construction and trades

Electrical capability

Your reliable electrical contractor.

Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Not a guarantee of work. All participants

Short answers

Can an owner install an EV charger in a sectional title complex?

Usually, an owner needs body corporate approval if an EV charger affects common property or the electricity supply. A registered electrician should issue a Certificate of Compliance, and agreed metering should ensure the owner pays for electricity under the scheme’s South African arrangements.

What should trustees get at handover for EV infrastructure?

The EV installation records should include an electrical Certificate of Compliance, the charger commissioning and test report, and the protection settings and load-management configuration. Store them with the scheme’s technical records and confirm that the South African supply and metering arrangements match the approved design.

Where do schemes go wrong with EV infrastructure?

Two common problems are chargers that overload the available supply and missing meters that leave other owners subsidising EV use. Before approving charging in a South African complex, check capacity and agree how electricity use will be measured and billed.