1. Scope the building
Units, existing meters, supply points and tariff needs are assessed.

PPP participant · Technology and metering
Metering, utility records and billing support.
Metering, utility records and billing support. Dev 360 can discuss a suitable specialist for a defined need. Current capacity, credentials and appointment are confirmed through a conversation with Dev 360.
Find Utility metering capability online:Website ↗

Capability, not a public participant profile
Metering, utility records and billing support. This page describes a capability category, not a named provider or a verified credential held by Dev 360.
Specialist identity, capacity and appointment are discussed privately with the relevant permission. Professional registrations, insurance, references and project-specific suitability must be checked before appointment.
In pictures


Images published by Utility metering capability on punchmetering.co.za.
Track record
As published by Utility metering capability.
Units, existing meters, supply points and tariff needs are assessed.
Smart meters go in alongside the municipal meter. Supply stays live.
Tariffs, recovery rules and resident accounts are set up on the platform.
Vending, billing, reporting, alerts and resident messaging switch on.
Outsource through Dev 360
7 services, scoped by Dev 360 in writing and delivered by Utility metering capability.
Secondary meters for electricity, water and gas, with automated meter reading and near real-time use data.
Billing, levy and utility-fee recovery and arrears allocation, with less manual admin.
A central vending dashboard, several payment channels and automatic token receipts.
NERSA-aligned time-of-use, block, seasonal, fixed and demand tariffs, plus Free Basic Electricity.
Live data, central reports and tamper, bypass and leak alerts.
Remote connection and disconnection, with full audit trails.
Single or bulk SMS and a resident app for balances, purchase history and instant vending.
When to call
Guides and checklists
Hiring smart metering providers? Trustees should confirm the municipality accepts the meter type and that the vendor signs a POPIA operator agreement.
Hiring body corporate software providers? Trustees should sign a POPIA operator agreement and check hosting, security and data export.
Hiring electrical contractors? Trustees should verify the contractor's current Department of Employment and Labour registration.
How trustees can assess water, electricity, backup power and other infrastructure issues in a complex, and when to bring in registered specialists.
How sectional title schemes can use AI for levy reminders and arrears triage without breaching POPIA section 71 on automated decisions.
Practical fraud controls for sectional title schemes: separate accounts, dual approval, fidelity cover, bank verification, conflict declarations…
This capability area covers metering, utility records and billing support. The relevant specialist, availability, scope and responsibilities are confirmed for each enquiry; this page is not an appointment.
Dev 360 discusses the need, relevant experience, professional requirements and availability. Any introduction is permission-based. Buyers should check the evidence relevant to the actual appointment.
The written proposal identifies the contracting parties, scope, fees and responsibilities. Regulated advice and professional sign-off remain with the appropriately qualified person or firm.
Suitable provider details may be shared privately for a specific, permission-based conversation. Dev 360 does not publish a participant register.
No. A capability description is not a promise of availability, an appointment, funding, approval or a result. Each party decides whether to proceed on agreed written terms.

Your reliable electrical contractor.
Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Precision plumbing. Expert construction.
Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Building and finishing trades, one crew.
Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling
Request a quote or introduction
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360