In South Africa, a client commissioning construction work has duties under the Occupational Health and Safety Act and Construction Regulations. The client must address project-specific health and safety requirements through planning, information, appointments and monitoring appropriate to the work. Delegating tasks to a contractor does not make safety irrelevant to the client. Confirm current duties with competent health and safety professionals and the regulator.

The client should consider foreseeable hazards while defining the work, including occupied premises, existing services, hazardous materials, working at height and restricted access. Give bidders relevant information about the site and operating constraints. Include health and safety requirements in the tender and budget rather than treating them as a later contractor matter. Project-specific duties can depend on the nature and scale of construction, so obtain competent advice on what the regulations require.
The client should make the appointments and provide information required by the applicable rules, including arrangements for competent construction management and health and safety roles where required. Contract wording should align with the actual allocation of duties and must not assume that a label alone transfers statutory responsibility. Ensure the project team knows who controls access, approves work methods, coordinates building operations and receives incident or risk information. Keep appointments and required documentation accessible.
Client oversight should check whether agreed arrangements are in place, whether issues are escalated and whether corrective actions are tracked. It does not mean the client directs unsafe work or substitutes for the contractor’s operational responsibilities. Use site reporting, coordination meetings and documented actions proportionate to risk. If a serious concern arises, follow the project escalation and stop-work arrangements, and seek competent professional guidance. Refer to the current OHS Act and Construction Regulations rather than relying on informal summaries.
No. The client has duties under the applicable OHS framework even when contractors perform the work. Specific obligations and appointments depend on the project, so get competent advice for the actual scope.
No. Applicable requirements depend on the nature and circumstances of the construction work. Confirm the current Construction Regulations and project-specific requirements with a competent health and safety professional.
The client should have clear escalation and stop-work arrangements in the project controls. Anyone facing an immediate danger should use the established safety process and obtain urgent competent assistance.
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
How computer vision can improve construction site safety in South Africa, with POPIA safeguards for cameras and the OHS duties that still apply.
How Dev 360 writes its guides: answer-first, sourced, South African context, confidential clients, no paid placement and a clear corrections process.
Talk to Dev 360