What to prepare before starting a commercial project

Before a commercial project starts, prepare a written brief, a realistic budget range, the site and building information you have, and a view of the approvals required. These four items make scoping and pricing accurate from day one and prevent expensive changes later.

By the Dev 360 teamSouth African context
Project manager and contractor reviewing drawings in an office fit-out

Key takeaways

  • A written brief beats a verbal one every time
  • Give a budget range; it shapes every design decision
  • Collect title deeds, plans, zoning and previous approvals early
  • Identify approvals and their lead times before committing to dates

The brief

  • What the space must do and for whom
  • Size, layout and quality expectations
  • Must-haves versus nice-to-haves
  • The date you need to occupy or open

The budget

Give a realistic range, including professional fees, contingency and VAT. A budget shared early lets the team design to it rather than redesign later.

Site and building information

  • Title deed, erf details and zoning
  • Existing plans, approved building plans and occupancy certificates
  • Lease conditions if you are a tenant
  • Known issues: services, access, heritage or environmental constraints

Approvals

List the approvals likely to be needed, such as building plan approval, rezoning or landlord consent, and their typical lead times in your municipality. Approvals often set the real programme.

A downloadable checklist version of this article is planned.

See also: A healing centre building revamp.

Short answers

What goes into a project brief?

A project brief states the space's purpose, size, quality expectations, priorities, target date and budget range. For a South African commercial project, add zoning, approved plans, lease terms, service constraints and likely municipal approvals. Dev 360 can use these details to scope work.

Which approvals should be in place first?

Confirm the site's zoning and any landlord or body corporate consent first, then identify building-plan approval and other permissions required by the relevant municipality. The sequence depends on the project and site. Check local requirements and likely lead times before promising an opening or occupation date.