Dev 360

Property development

NHBRC enrolment for entry-level housing: the builder's checklist

Every home builder must register with the NHBRC, and every new home must be enrolled at least 15 days before construction starts, subject to statutory exclusions. The warranty covers non-compliance for 3 months, roof leaks for 1 year and major structural defects for 5 years from occupation. Use the NHBRC's official calculator for current enrolment fees.

By the Dev 360 teamSouth African context
Surveyor’s instrument and boundary pegs on open grassland earmarked for development

Key takeaways

  • Builders must be NHBRC-registered
  • Enrol each home at least 15 days before construction
  • Warranties: 3 months, 1 year and 5 years
  • Check current fees on the NHBRC calculator

The checklist

  • Builder registration with the NHBRC is current
  • Each home enrolled at least 15 days before construction starts
  • Approved building plans
  • Engineer's foundation design where the site requires it
  • NHBRC inspections scheduled at the required stages
  • Enrolment certificate issued to the buyer
  • Handover pack with warranties

Warranty cover (from occupation)

DefectPeriod
Non-compliance or deficiencies3 months
Roof leaks1 year
Major structural defects5 years

Fees

Enrolment fees are set under NHBRC rules and tied to the home's selling or contract value. Use the NHBRC's online calculator for the current figure.

Why it matters

Buyers are protected against defects, and lenders typically require proof of enrolment. Late enrolment causes delays and penalties.

Sources

Check each source’s current version before acting.

Short answers

When must a new home be enrolled with the NHBRC?

Enrol each eligible new home with the NHBRC at least 15 days before construction starts. The Housing Consumers Protection Measures Act has statutory exclusions, and the builder must also be registered. Provide the enrolment certificate to the South African buyer.

What does the NHBRC warranty cover?

NHBRC cover includes 3 months for non-compliance, 1 year for roof leaks and 5 years for major structural defects. The periods run from occupation and remain subject to the Housing Consumers Protection Measures Act and the home's enrolment conditions.

How much is NHBRC enrolment?

NHBRC enrolment fees depend on the home's value and the current fee schedule. Use the NHBRC online calculator for the amount that applies in South Africa, because fees are set under its rules and may change.

Get in touch