Dev 360

Africa and infrastructure

What is a smart city in an African metro?

A smart city uses data, digital tools and coordinated infrastructure to improve specific urban services such as mobility, utilities or public information. For African metros, the useful starting point is a defined service problem, not a technology purchase. Set a measurable public objective, confirm data governance and interoperability, and test a practical pilot before scaling. Technology should support accountable service delivery rather than create a disconnected platform.

By the Dev 360 teamNovember 2026South African context
Urban infrastructure systems being considered for a connected city service

Key takeaways

  • Begin with a service problem
  • Design for interoperability and inclusion
  • Set data governance before deployment
  • Test a limited pilot before scaling

Choose a service outcome

A smart city initiative should identify a concrete urban problem, the public authority responsible and the people affected. Examples might include service reporting, traffic information or monitoring infrastructure assets. Define what better service would look like and how it can be measured using reliable data. Avoid describing a platform as the outcome. A clear service objective helps compare technology options and prevents procurement from being driven by novelty.

Build governance into the design

Decide who owns and maintains data, who can access it, how systems exchange information and how residents can raise concerns. Consider cybersecurity, privacy, procurement lock-in, accessibility and continuity if a vendor changes. Interoperability requires standards and contract terms, not just compatible devices. Involve operational teams and communities early so that data collection, interfaces and service changes suit the people expected to use them.

Pilot, evaluate and scale carefully

A limited pilot can test assumptions, costs, usability, maintenance and institutional readiness before a larger commitment. Define baseline information, success measures, exit conditions and ownership of equipment and data. A pilot should not be represented as proof of metro-wide impact. Dev 360’s property technology pilots focus on testing technology in property settings; broader city programmes need the relevant public authority and local procurement process.

Short answers

Does a smart city need sensors everywhere?

No. Select data sources that are necessary for a defined service objective. Sensors are only one option and may add cost and maintenance needs

Who should own smart-city data?

The project should document data roles, access, retention, security and permitted use. Responsibilities depend on the service, parties and applicable law

How can a metro avoid vendor lock-in?

Set interoperability, data export, documentation, transition assistance and service continuity requirements in procurement and contract terms Confirm this before work starts

Africa and infrastructure

Property technology pilots

Controlled property technology pilots for sectional title schemes: metering, levy, maintenance and access systems, measured before any wider rollout.

Africa and infrastructure

Technology consultation

Independent technology advice before you buy or build: system selection, supplier and quote reviews, connectivity, infrastructure and digital presence.

Get in touch