Architectural plans should be prepared and signed by a professional whose current SACAP registration category and competence are appropriate to the work. The local authority decides whether a submission meets its requirements, so a signature alone does not secure approval. Ask who is professionally responsible, verify registration with SACAP, and confirm how the architect will coordinate supporting information and the council process.

SACAP registration is the key starting point for checking a person’s standing in the architectural profession. Request the individual’s registration details and verify them through SACAP. Ask which professional will prepare and sign the architectural documentation, not only which firm has been appointed. The registration class and project scope should be appropriate. Other project disciplines may have their own professional requirements and should not be assumed to fall under the architect’s signature.
A professional signature does not itself mean that the drawings have been accepted by a municipality or that all statutory, planning and technical requirements have been met. The responsible authority assesses the application under the applicable rules and may request changes or additional information. Confirm the approval status and approved drawing set before relying on documents for construction. Keep revisions clear so outdated material is not mistaken for the authorised version.
Before work starts, identify the architect’s scope, the client’s decisions and the role of other consultants. Confirm who prepares the application, who responds to authority comments and who checks revisions. Dev 360’s Architecture service is delivered through Architecture and planning. You can also review Architecture and planning and confirm an individual professional’s current standing through SACAP. Record the agreed roles and communication route in writing.
Check each source’s current version before acting.
Do not assume so. Confirm the person’s registration or professional status, the type of work and the local authority’s submission requirements
No. Registration does not guarantee municipal approval. The relevant authority reviews the application and can require changes or further information
The client and project team should confirm the approved set and revision status with the relevant authority before construction proceeds
Dev 360 Architecture with Architecture and planning: building design, municipal submission drawings, refurbishment and adaptive reuse in Gauteng.
Outsource architectural design, municipal submission drawings and construction documentation to Architecture and planning through Dev 360's PPP.
SACAP registration categories indicate recognised professional scope. Learn how to verify registration and assess whether an architect fits your South.
Talk to Dev 360