Waterproofing and water repellency
Penetrating treatments and coatings that keep water out of concrete, masonry, walls, roofs and stone.

PPP participant · Building materials and coatings
Surface protection, coating selection and waterproofing.
Surface protection, coating selection and waterproofing. Dev 360 can discuss a suitable specialist for a defined need. Current capacity, credentials and appointment are confirmed through a conversation with Dev 360.
Find Protective coatings supplier online:Website ↗Facebook ↗

Capability, not a public participant profile
Surface protection, coating selection and waterproofing. This page describes a capability category, not a named provider or a verified credential held by Dev 360.
Specialist identity, capacity and appointment are discussed privately with the relevant permission. Professional registrations, insurance, references and project-specific suitability must be checked before appointment.
In pictures




Images published by Protective coatings supplier on nanosmartcoat.com.
Outsource through Dev 360
9 services, scoped by Dev 360 in writing and delivered by Protective coatings supplier.
Penetrating treatments and coatings that keep water out of concrete, masonry, walls, roofs and stone.
SurfaPore RD: a breathable treatment for walls and masonry with rising damp.
SurfaPore M protects marble, granite, mosaic and natural stone from moisture, oil and stains.
SurfaPore W protects wood against water, oil stains and warping, and keeps it breathable.
SurfaPaint Aqua X, a breathable water-repellent acrylic, and SurfaPaint ThermoDry Exterior, which reflects heat.
Waterproof roof coatings that bridge small cracks and keep buildings cooler.
SurfaSil Kirei: a breathable coating that resists moisture and microbes.
SurfaMix products for adhesion, surface strength, moisture reduction and flexible, water-resistant mortar.
DeSalin treatments for mould, cement and salt deposits, rust and fireplace residue.
In their clients' words
“Protective coatings supplier took the time to discuss the substrate and the source of water penetration before suggesting a solution.”
“Protective coatings supplier helped our team match surface treatments to the requirements of each job. We appreciated the clear advice.”
“Protective coatings supplier helped us understand the surfaces we were treating and choose suitable products.”
Published reviews from nanosmartcoat.com.
When to call
Guides and checklists
Hiring roofing and waterproofing contractors? Trustees should check references, guarantees and whether structural work needs an engineer.
Hiring painting contractors? Trustees should check product suitability and data sheets, and how old paint will be prepared and disposed of.
Hiring environmental consultants? Trustees should use a registered environmental assessment practitioner where environmental authorisation is needed.
Why South African sectional title schemes decline (reserves, arrears, insurance, municipal services) and the legal tools trustees use to reverse it.
What a PMR 22 maintenance, repair and replacement plan must contain, how it sets the reserve contribution, and a checklist trustees can use before…
When trustees may raise a special levy, how it differs from reserve fund contributions, and why repeated special levies signal a planning problem.
This capability area covers surface protection, coating selection and waterproofing. The relevant specialist, availability, scope and responsibilities are confirmed for each enquiry; this page is not an appointment.
Dev 360 discusses the need, relevant experience, professional requirements and availability. Any introduction is permission-based. Buyers should check the evidence relevant to the actual appointment.
The written proposal identifies the contracting parties, scope, fees and responsibilities. Regulated advice and professional sign-off remain with the appropriately qualified person or firm.
Suitable provider details may be shared privately for a specific, permission-based conversation. Dev 360 does not publish a participant register.
No. A capability description is not a promise of availability, an appointment, funding, approval or a result. Each party decides whether to proceed on agreed written terms.

Your reliable electrical contractor.
Services: Residential installations and repairs · Commercial and industrial installations · Inspections and certificates of compliance · Solar and backup power · Lighting design and LED upgrades · Earthing, bonding and lightning protection · Infrared thermography · Emergency repairs and maintenance

Precision plumbing. Expert construction.
Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Building and finishing trades, one crew.
Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling
Request a quote or introduction
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360