Hiring consulting engineers for a sectional title scheme

Before hiring consulting engineers, trustees should verify the engineer's ECSA registration in the right category. At handover, insist on signed designs, an inspection or completion certificate and test records. The key standard here is Engineering Profession Act 46 of 2000.

By the Dev 360 teamSouth African context
Hands drawing a floor plan with a pencil and scale ruler

Key takeaways

  • ECSA registration and category
  • At handover: signed designs or calculations
  • Engineering Profession Act 46 of 2000
  • Also check: national Building Regulations

What to check before you appoint

  • ECSA registration and category
  • Professional indemnity insurance
  • Scope and fee basis (ECSA guideline fees are guidance only)
  • Site inspection plan

What to ask for at handover

  • Signed designs or calculations
  • Inspection and completion certificate
  • Test and as-built records

Rules and standards that apply

  • Engineering Profession Act 46 of 2000
  • National Building Regulations

Common mistakes

  • Contractors self-certifying design
  • No site inspections

Baseline checks

Start with the six baseline checks that apply to every contractor.

Sources

Check each source’s current version before acting.

Important. Generic guidance for engineering consulting. Confirm the current municipal rules for your site.

Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.

Through the PPP

Participants who deliver this

Dev 360 can outsource engineering consulting work to these participants, or introduce you.

Dev 360 capability
Investment and advisory

Investment advisory capability

Strategic investment. Sustainable growth.

Services: Investment advisory · Corporate finance · Capital raising · Deal structuring · Project finance · M&A and transactions · Strategic advisory · Valuation and modelling · Investor readiness · Executive support

Dev 360 capability
Design and architecture

Architecture and planning

Architecture, planning and 3D design for Gauteng projects.

Services: Architectural design · Spatial planning · CAD documentation · 3D visualisation · Refurbishment and adaptive reuse · Engineering coordination

Not a guarantee of work. All participants

Short answers

When does a body corporate need an engineer?

A body corporate needs an engineer for structural, civil, electrical or mechanical design, rational design or certification, and condition assessments of major items. In South Africa, check that the engineer holds ECSA registration in the relevant category and obtain the agreed technical records.

What should trustees get at handover for engineering consulting?

For engineering work, the handover should include signed designs or calculations, an inspection or completion certificate, and test and as-built records. Keep the package with the scheme’s records, and make sure the documents match the agreed scope and relevant South African building requirements.

Where do schemes go wrong with engineering consulting?

Typical engineering failures are contractors certifying their own designs and projects proceeding without site inspections. A body corporate should use an appropriately ECSA-registered consultant and follow the inspection plan, particularly where South African building requirements apply.

PPP

All 43 industry spotlights

Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.

Get in touch