Before a commercial refurbishment, verify existing building information and investigate the services, structure and conditions that could affect the planned work. Review available records, inspect accessible areas and commission specialist surveys where risks justify them. Record limitations and unknowns in the tender documents. A survey reduces uncertainty but cannot guarantee that concealed conditions will match drawings.

Collect available as-built drawings, service schedules, maintenance records and previous approvals. Compare them with visible conditions during a site walk, and note discrepancies rather than treating old records as verified. Secure permission to inspect ceiling voids, risers, plant rooms and other restricted areas. Coordinate with the landlord and operations team so surveys do not disrupt critical services or expose occupants to uncontrolled work.
Decide whether specialist surveys are needed for structure, electrical capacity, mechanical services, hazardous materials or other relevant conditions. The scope should explain what was inspected, what could not be accessed and the limits of any conclusions. Use competent specialists and plan intrusive investigations safely. The project team can then prioritize design changes or provisional allowances based on evidence instead of carrying every unknown as an unexamined contingency.
Update the coordinated design and share relevant findings with bidders, while clearly identifying unresolved issues. Add required isolations, access, testing and reinstatement to the scope. Allow time for investigations and approvals before finishes conceal services. If an unexpected condition is found during construction, follow the contract notice and change procedure, preserve evidence and assess safe options before proceeding. Good surveys improve decisions, but they do not remove the need for project controls.
Not necessarily. Drawings may be incomplete or outdated. Verify critical routes on site and commission additional investigation where the work or risk warrants it.
They may be possible with suitable permissions, safe work methods and disruption controls. Assess each survey task with the building manager and competent professionals before proceeding.
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
Plan a commercial fit-out contingency in South Africa with a clear scope, risk register and controlled approvals before construction begins.
Identify scope gaps before a commercial project starts by mapping interfaces, exclusions, design responsibilities, approvals and handover deliverables.
Talk to Dev 360