Dev 360

Africa and infrastructure

How can infrastructure projects plan for climate resilience?

Infrastructure projects can plan for climate resilience by identifying relevant climate hazards, understanding how assets and users are exposed, and testing whether the proposed design and operations can maintain service under disruption. Consider the full asset life cycle, linked systems and maintenance capacity. Resilience is project-specific: use credible local evidence and specialist input rather than applying a generic checklist as a substitute for risk assessment.

By the Dev 360 teamNovember 2026South African context
Infrastructure planning that considers climate exposure and resilience

Key takeaways

  • Assess location-specific hazards
  • Test dependencies and service continuity
  • Design for operation and maintenance
  • Include resilience requirements in procurement

Assess hazards and exposure

Identify the climate-related hazards relevant to the site and asset, such as heat, flooding, drought, wildfire or coastal conditions where applicable. Use credible local information and account for uncertainty over the project life. Map who and what may be affected, including communities, access routes, power, water and communications. A hazard list alone is not enough; the assessment should connect exposure to the service the infrastructure is intended to provide.

Test resilience across linked systems

Infrastructure depends on other systems. A road may rely on drainage and bridges; a water facility may depend on energy and access; a public building may rely on cooling and water supply. Examine failure points, alternative routes, redundancy and recovery arrangements. Compare design options and operating practices, including inspection and maintenance. Involve the asset owner and operators so resilience measures remain practical after construction and handover.

Carry requirements into delivery

Translate assessed risks into design criteria, specifications, maintenance plans and procurement requirements. Identify who verifies the criteria and what evidence is needed during design and construction. Consider lifecycle costs and the capacity to maintain or replace components. The African Development Bank publishes information on infrastructure and climate work; project teams should also consult applicable national standards and climate assessments for the specific location.

Sources

Check each source’s current version before acting.

Short answers

Is climate resilience only about extreme weather?

No. It also concerns how infrastructure maintains or restores its service as climate conditions and associated stresses change over time

Can a generic climate checklist prove resilience?

No. It can prompt questions, but project decisions require location-specific evidence, risk assessment and appropriate professional input Confirm this before work starts

When should resilience be considered?

During project identification and preparation, then carried through design, procurement, construction, operation and maintenance Confirm this before work starts Confirm this before work starts

Get in touch