Hiring demolition contractors for a sectional title scheme

Before hiring demolition contractors, trustees should screen for asbestos and confirm a competent demolition supervisor and health and safety file. At handover, insist on a demolition completion record, waste records and an asbestos clearance certificate where relevant. The key standard here is Construction Regulations, 2014.

By the Dev 360 teamSouth African context
Project manager and contractor reviewing drawings in an office fit-out

Key takeaways

  • Asbestos survey before work
  • At handover: completion record
  • Construction Regulations, 2014 (regulation 14)
  • Also check: asbestos Abatement Regulations, 2020

What to check before you appoint

  • Asbestos survey before work
  • Registered asbestos contractor for Type 2 and 3 work
  • Demolition method statement and supervisor
  • Municipal permit where required

What to ask for at handover

  • Completion record
  • Waste disposal records
  • Asbestos clearance certificate

Rules and standards that apply

  • Construction Regulations, 2014 (regulation 14)
  • Asbestos Abatement Regulations, 2020

Common mistakes

  • Asbestos roof sheets removed by general contractors
  • Illegal dumping

Baseline checks

Start with the six baseline checks that apply to every contractor.

Sources

Check each source’s current version before acting.

Important. Generic guidance for demolition and removal. Confirm the current municipal rules for your site.

Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.

Short answers

Can a general contractor remove asbestos roof sheets?

Not for Type 2 or Type 3 asbestos work. South African rules require a registered asbestos contractor for those jobs and an asbestos clearance certificate where applicable; trustees should arrange a survey and confirm the contractor's authorisation before removal starts.

What should trustees get at handover for demolition and removal?

The demolition close-out records should include a completion record, waste-disposal documentation and an asbestos clearance certificate where relevant. Retain them with the scheme's records and confirm that asbestos handling followed the applicable South African construction and abatement requirements.

Where do schemes go wrong with demolition and removal?

Using a general contractor to remove asbestos roof sheets and illegally dumping demolition waste are major failures. Before work, screen for asbestos, verify the required registration and permit, and agree lawful waste handling under the applicable South African rules.

PPP

All 43 industry spotlights

Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.

Get in touch