Dev 360

Professional services · PPP spotlight

Hiring health and safety consultants for a sectional title scheme

Before hiring health and safety consultants, trustees should check the health and safety file and, for construction, SACPCMP registration where the role needs it. At handover, insist on a complete health and safety file and COIDA letter of good standing. The key standard here is OHS Act 85 of 1993.

By the Dev 360 teamSouth African context
Hands drawing a floor plan with a pencil and scale ruler

Key takeaways

  • Construction health and safety agent or officer registration where required
  • At handover: complete health and safety file
  • OHS Act 85 of 1993
  • Also check: construction Regulations, 2014

What to check before you appoint

  • Construction health and safety agent or officer registration where required
  • Health and safety plan and risk assessments
  • COIDA letter of good standing
  • OHS section 37(2) mandatary agreement

What to ask for at handover

  • Complete health and safety file
  • Incident and training records
  • COIDA letter of good standing

Rules and standards that apply

  • OHS Act 85 of 1993
  • Construction Regulations, 2014
  • COIDA

Common mistakes

  • No baseline risk assessment from the client
  • Contractors without COIDA cover

Baseline checks

Start with the six baseline checks that apply to every contractor.

Sources

Check each source’s current version before acting.

Important. Generic guidance for health and safety. Confirm the current municipal rules for your site.

Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.

Through the PPP

Participants who deliver this

Dev 360 can outsource health & safety work to these participants, or introduce you.

Dev 360 capability
Construction and trades

Plumbing and maintenance

Precision plumbing. Expert construction.

Services: 24/7 emergency plumbing · Residential and commercial plumbing · Leak detection and water management · Pipe relining and repair · Bathroom and kitchen installations · Construction and renovation · Fire-equipment installation · Fire-equipment inspection, servicing and training

Not a guarantee of work. All participants

Short answers

Is a body corporate a client under the Construction Regulations?

Yes, when it commissions construction work. Under the Construction Regulations, 2014, made under the OHS Act, the body corporate as client must provide a baseline risk assessment and a health and safety specification before work starts.

What should trustees get at handover for health and safety?

The health and safety handover should include the complete safety file, incident and training records, and a COIDA letter of good standing. Retain the material with the project records and check that the South African construction work has the required close-out documentation.

Where do schemes go wrong with health and safety?

A missing client baseline risk assessment and contractors without COIDA cover are common health and safety gaps. Before construction starts in South Africa, trustees should confirm that the risk information, safety specifications and contractor standing are in place.

PPP

All 43 industry spotlights

Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.

Get in touch