
Building and finishes practice
Building and finishing trades, one crew.
Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling
Specialist trades · PPP spotlight
Before hiring flooring and tiling contractors, trustees should check the installer's competence and product suitability for traffic, wet areas and slip risk. At handover, insist on product certificates, installation records and slip-performance evidence where specified. The key standard here is SANS 10107.

Start with the six baseline checks that apply to every contractor. Because flooring and tiling is a major capital item, it also belongs in the 10-year maintenance plan.
Check each source’s current version before acting.
Important. Generic guidance for flooring and tiling. Confirm the current municipal rules for your site.
Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.
Through the PPP
Dev 360 can outsource flooring & tiling work to these participants, or introduce you.

Building and finishing trades, one crew.
Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling

Solutions provider to the shopfitting and furniture manufacturing industry.
Services: Shopfitting and interiors · Furniture and joinery · Property condition assessments · Remedial scopes and BOQs · Maintenance and upgrades · Coatings and surface repairs
Not a guarantee of work. All participants
Yes. In South Africa, SANS 10107 covers ceramic tiling design and installation, while SANS 10400-D addresses public-safety slip risks. Select products for their location, particularly wet areas, external stairs and walkways.
The flooring close-out should provide product certificates, installation and adhesive records, and a snag and acceptance report. File these with the scheme records and check the specified products and workmanship against the South African standards and project requirements.
Common defects include slippery tiles on external stairs and missing movement joints that allow tiles to lift. For a South African scheme, review slip performance and installation details at stairs and walkways, and inspect the substrate and joints before signing off.
Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.
Hiring carpenters and joiners? Trustees should check product certification for fire doors and treated timber, and installer capability.
Hiring demolition contractors? Trustees should screen for asbestos and confirm a competent demolition supervisor and health and safety file.
Talk to Dev 360