Dev 360

Insights · Property

Energy and utilities insights

Answers on rooftop solar, batteries, embedded generation registration, wheeling, metering, water resilience, backup power and EV charging for South African businesses and sectional title schemes.

Rooftop solar panels on a residential complex

20 articles

Energy and utilities

How do you size a battery for a building?

Battery storage sizing basics for South African buildings: estimate critical loads, backup duration, usable capacity, inverter power and operating needs.

Energy and utilities

What does a business energy audit check?

Use this energy audit checklist to review business consumption, tariffs, equipment, peak demand and practical efficiency actions in South Africa.

Energy and utilities

Who can issue a gas installation certificate?

Learn when gas installation certificates matter, who should install gas systems and what sectional title trustees should check for safety and records.

Energy and utilities

AI energy optimisation on sectional title roofs

How AI can lower common-property energy costs by scheduling batteries, pumps and lighting around solar output and tariffs, plus the approvals schemes need.

Get in touch