Architecture
Dev 360 Architecture with Architecture and planning: building design, municipal submission drawings, refurbishment and adaptive reuse in Gauteng.
Design and architecture
SACAP registration categories distinguish professional registration classes within South Africa’s architectural profession. Before appointing someone, confirm their current registration and whether their professional scope fits the proposed work. The category alone does not replace a project-specific assessment of experience, appointment terms or required consultants. Dev 360 coordinates architecture support through Architecture and planning; professional registration is confirmed for each project.

SACAP regulates the architectural profession under the Architectural Profession Act. Ask for the professional’s full name and registration details, then check current status through SACAP’s official channels. Registration classes reflect different categories of architectural work and responsibility. Do not rely only on a company profile, title or marketing description. If a project requires architectural services, confirm which individual will take responsibility and how their role relates to the rest of the design team.
The right appointment depends on the project’s nature, complexity and required services. Discuss whether the scope includes concept design, documentation, coordination, statutory submissions, site involvement or completion support. Ask which tasks are included and what expertise is provided by other consultants. A registration category is one useful check, not a guarantee that a person has handled an identical project or that an approval will be granted.
The appointment should identify the professional, the client, the services, deliverables, fees, exclusions and communication process. Ask who reviews drawings, manages changes and signs the architectural work. Dev 360 Architecture is delivered through Architecture and planning, a Preferred Participation Panel participant. For an independent status check, consult the SACAP website and ask questions before authorising work. Keep responsibilities clear for the full project team.
Check each source’s current version before acting.
No. Registration indicates professional status and category, not a guaranteed outcome. Approval depends on the submission, applicable requirements and the relevant authority
Check the person’s current registration category and the scope relevant to the project. Ask the professional to explain their role and any additional expertise required.
Use SACAP’s official channels to verify current registration. Ask for the individual’s details rather than relying on a firm name alone
Dev 360 Architecture with Architecture and planning: building design, municipal submission drawings, refurbishment and adaptive reuse in Gauteng.
Outsource architectural design, municipal submission drawings and construction documentation to Architecture and planning through Dev 360's PPP.
In South Africa, appropriately registered professionals handle architectural work. Learn how to check who can sign plans and what approval does not mean.
Talk to Dev 360