Commercial turnkey projects
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
Commercial projects
Find scope gaps by comparing the project brief, drawings, specifications, landlord rules, contractor offers and required handover documents in one coordinated review. Assign responsibility for every interface and identify unresolved assumptions before site work begins. A turnkey coordinator can help manage the process, but the client should approve the scope and confirm the contract documents are consistent.

Start with the client’s operational outcomes, then check that each requirement appears in a drawing, specification, schedule or explicit exclusion. Look for missing equipment, data, signage, access control, finishes and temporary works where relevant. Confirm whether the design is complete enough to procure and whether landlord or statutory comments have been incorporated. A requirement that exists only in meeting notes may not be priced or delivered.
Create an interface list showing who designs, supplies, installs, connects, tests and makes good each element. Pay particular attention to existing services, landlord infrastructure, tenant equipment, specialist systems and work by separate suppliers. Ask each contractor to state assumptions and exclusions. Where parties share an interface, name a coordinator and define the hand-off information. Clear boundaries reduce the chance that each party assumes another contractor has allowed for the same task.
Confirm what evidence the client needs to operate and maintain the completed space, including testing, certificates where applicable, manuals, warranties, training and record drawings. Match those deliverables to contract requirements and responsible parties before award. Review the programme for inspections and access to concealed work. A scope review is most useful before mobilisation, when gaps can be priced and assigned without disrupting site progress.
Responsibility depends on the contract, design appointments and agreed scope. Review the documents and obtain professional advice rather than assuming the contractor or client automatically owns a missing item.
Important scope decisions should be recorded in writing and reflected in the contract or controlled project documents. Verbal instructions can be misunderstood and may not satisfy contract procedures.
Yes. Specify the required records before appointment so bidders can price the work and allocate responsibility for collecting and preparing them.
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
What to prepare before a commercial project: a written brief, budget range, site and building information and the approvals likely to be needed.
Use a structured snag list and handover checklist to track defects, operating information and compliance records on a commercial fit-out.
Talk to Dev 360