Commercial turnkey projects
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
Commercial projects
A commercial fit-out snag list records incomplete or defective work, its location, responsible party, target date and close-out evidence. It should sit alongside, not replace, commissioning results, compliance documents, operating instructions and formal acceptance steps. Inspect against the agreed scope and contract, then distinguish urgent safety issues from routine defects before the client takes over the space.

Walk each area systematically and compare visible work with the contract documents, approved samples and coordinated drawings. Describe each issue precisely, identify its location and attach a photograph or reference where useful. Avoid vague entries such as “fix finish”. Record who must respond, the agreed target and the person who will verify closure. Separate incomplete work from damage or defects, and flag any item that could affect safe use or essential operations.
A snag list does not prove that systems have been tested or that statutory documents have been collected. The handover pack may need commissioning records, warranties, product information, operating and maintenance manuals, training records, keys, access credentials and applicable compliance certificates. Confirm the contract and project requirements to determine the exact set. Make a register showing received, outstanding and not-applicable items so missing records do not disappear in a folder.
Set out how the contractor will notify the client that an item is complete and how the client will verify it. Record any agreed outstanding work, access arrangements and dates in writing. Acceptance, practical completion, retention and final payment are governed by the contract, so use its defined procedures rather than informal assumptions. Keep a final version of the register with closure evidence and ensure the operational team knows how to report defects during any applicable defects period.
The terms are often used for incomplete or defective items, but the contract may distinguish completion, defects and correction periods. Follow the contract definitions and keep each issue documented.
That depends on the contract, the nature of the outstanding work and the client’s decision. Resolve safety-critical and occupation-related issues first, and record any accepted outstanding items and close-out dates formally.
The project-specific list may include commissioning records, warranties, manuals, training information, keys and applicable compliance certificates. Check the contract, authority requirements and systems installed to confirm what is due.
Commercial fit-outs, refurbishments and new builds managed from brief to handover through one accountable point of contact in Gauteng.
What to prepare before a commercial project: a written brief, budget range, site and building information and the approvals likely to be needed.
Check building approval, completion documents and municipal requirements before occupying a newly built or altered commercial space.
Talk to Dev 360