
Architecture and planning
Architecture, planning and 3D design for Gauteng projects.
Services: Architectural design · Spatial planning · CAD documentation · 3D visualisation · Refurbishment and adaptive reuse · Engineering coordination
Participants · Service line
Dev 360 outsources architectural design and submission drawings to Architecture and planning, a participant in its Preferred Participation Panel (PPP), with design and 3D visualisation by a Dev 360 Associate. Homeowners, developers and commercial owners get design-led thinking from the first sketch, coordinated with engineers, approvals and delivery.

At a glance
| Best for |
|
|---|---|
| Not the right fit if |
|
| What you get | Architectural design, submission drawings, design proposals and 3D visualisation |
| How it is priced | Written scope and quote in rand after a scoping conversation |
| Where | South Africa |
| Who delivers | PPP design participants and architects, coordinated by Dev 360 |
PPP participants in this service line

Architecture, planning and 3D design for Gauteng projects.
Services: Architectural design · Spatial planning · CAD documentation · 3D visualisation · Refurbishment and adaptive reuse · Engineering coordination
What this covers
Concept and design development for residential and commercial buildings.
Building plans prepared and submitted for municipal approval under the National Building Regulations.
Working drawings, details and schedules that contractors price and build from.
Working with designers, engineers and contractors so the design can be built as drawn.
When to use it
How Dev 360 delivers it
Describe the work, the site and the timing.
Dev 360 checks the scope against the participant's services, coverage and availability.
Scope, responsibilities, cost in rand and who you contract with are agreed before work starts.
Dev 360 coordinates, reports progress and hands over the documents.
Read before you appoint
Hiring architects and designers? Trustees should verify SACAP registration of the person submitting plans.
Hiring landscapers? Trustees should check water restrictions, irrigation rules and invasive-species obligations.
Hiring property developers? Trustees should verify NHBRC registration for home building and approvals for planning work.
With Design Studio, Dev 360 delivers design proposals, sun studies, floor-plan digitisation and photo-real 3D visualisation for homes, hotels and…
The rezoning and land-use application process in Gauteng under SPLUMA and municipal by-laws: who applies, documents, public participation and…
Why the delivery model now decides whether a South African development works: live feasibility, aligned participants, performance-linked contracts.
Check each source’s current version before acting.
For South African building plans submitted for municipal approval, the person preparing them must be registered with SACAP in a category that covers the work. Dev 360 provides this through Dev 360 Architecture with Architecture and planning, and the required registration still applies.
A Design Studio proposal can set out site analysis, sun studies, space zoning, plans, elevations, sections, interiors, landscaping and high-resolution renders. For South African design work, Dev 360 scopes and coordinates the proposal in writing.
Yes. Design Studio can provide 3D visualisations, renders and walkthroughs so owners can review a design before building. Dev 360 scopes and coordinates the visualisation through the design process, helping changes be considered on screen first.
No. The site labels design images as visualisations, not photographs of completed buildings; client, project name and location remain confidential. Design Studio develops the design intent, while Dev 360 coordinates design and delivery work.
Dev 360 agrees the scope, appoints the design team and coordinates specialists through approvals, construction and handover. For design and architecture work, Design Studio and Architecture and planning deliver the specialist services.
Electrical capability, Plumbing and maintenance, Building and finishes practice, Ultimate Concepts and Solutions
Community scheme finance capability, Legal services practice, Financial planning capability
Utility metering capability
Website design, social media, branding, SEO and AEO, CRM, AI and 3D visualisation, delivered by Dev 360 for clients and participants.
Answers to the questions people ask before they appoint.
Hiring architects and designers? Trustees should verify SACAP registration of the person submitting plans.
How 3D visualisation helps owners, trustees and developers decide before construction: fewer changes, faster approvals and better buy-in.
The seven gates PropDev 360 clears before a development moves forward: verify, feasibility, diligence, structure, approvals, delivery and handover.
Request a quote
A few lines is enough.
Every enquiry is read by a person and answered by email.
Talk to Dev 360