Dev 360

Flagship · Design Studio

A cinema experience centre, designed by a Dev 360 Associate

A Dev 360 Associate designed a cinema and smart-living experience centre concept: a parametric reception, a lounge cinema, a star-ceiling home cinema, a bar lounge, a media wall and living and bedroom suites, shown here as design visualisations. The concept can be adapted for showrooms, hospitality venues, estates and private homes.

Concept and visualisationDesign by a Dev 360 AssociateClient details kept confidential
Parametric reception and entrance lobby with a flowing sculpted wall
Type
Cinema and smart-living experience centre
Design
A Dev 360 Associate
Stage
Concept and visualisation
Client and location
Confidential

The brief

What the centre had to do

Let visitors feel a private cinema before they buy one. The brief was a single venue where sound, picture, light and comfort could be tried room by room, from a family lounge to a dedicated home cinema, and where every room sells the next one.

The centre also had to work as a showroom by day and a hosted venue by night, with technology hidden in the architecture rather than on display.

The approach

How Design Studio designed it

  1. Rooms as a journey

    Visitors move from a bright media and living area into darker, more immersive rooms, ending in the home cinema.

  2. Light as the signature

    Sculpted light lines, wave-lit ceilings, a neon bar feature and a fibre-optic star ceiling give each room its own mood.

  3. Acoustics built in

    Wall linings, seating and screen walls are planned with the sound system, so the rooms perform as well as they look.

  4. Technology out of sight

    Screens, speakers and controls sit in joinery and ceilings, so the space reads as a home, not an equipment store.

What visitors experience

  • A lounge cinema wall with leather seating for informal viewing
  • A dedicated home cinema with tiered seating and a star ceiling
  • A curved bar lounge with backlit shelving
  • A media wall and TV unit with an integrated light line
  • A rotating art wall for screens and artwork
  • Living and bedroom suites that show cinema in everyday rooms

Inside the centre

Design visualisations and stills from the design-visualisation walkthrough, from the entrance lobby to the cinema.

Adapting the concept

The room sequence, lighting language, joinery details and cinema layouts were designed as a concept that can be adapted for a new venue instead of starting from zero. Rights to use the design are agreed in writing for each project.

  • Showrooms and brands: an experience-centre format for audio-visual, smart-home and lifestyle brands.
  • Hospitality: private screening rooms and lounges for hotels, lodges and venues.
  • Estates and developments: a residents' cinema or clubhouse that adds value to a scheme.
  • Private homes: a home cinema or media room planned with the same standard.

Every adaptation is scoped in writing. Architectural work is coordinated through Dev 360 Architecture.

Short answers

Who designed the cinema experience centre?

A Dev 360 Associate designed the centre concept, including the room sequence, lighting concept, joinery and cinema layouts. The client and address are kept confidential.

Can Dev 360 design a home cinema or media room?

Yes. Design Studio designs home cinemas, media rooms and lounges, planning seating, sightlines, acoustics, lighting and hidden technology together. Architectural and electrical work is done by registered professionals.

Can the experience centre concept be used for another venue?

Yes. The concept can be adapted for showrooms, hospitality venues, estates and private homes, with the scope, fees and licence terms agreed in writing first.

Are these photographs or renders?

These are stills from a walkthrough of the experience-centre concept shown through design visualisations, not renders. Other Design Studio work on the site is labelled as design visualisation where it has not been built.

Solution

Design Studio

Dev 360 design and 3D visualisation for landmark homes, hospitality and experience spaces.

Solution

Architecture

Architecture support through Architecture and planning, coordinated by Dev 360.

Cinema and experience spaces

Plan a cinema, lounge or experience centre

A few lines is enough.

Every enquiry is read by a person and answered by email.

We use these details to respond to your enquiry. Please do not include ID numbers, banking, health or other sensitive personal information. Our service providers, some outside South Africa, process it for us under agreements that protect it. See the privacy policy.

Get in touch