How can a building improve water resilience responsibly?

A building can improve water resilience by reducing demand, storing water safely and assessing alternatives such as boreholes or greywater for suitable non-potable uses. Before installation, check municipal by-laws, water-use permissions, plumbing separation, water quality and maintenance obligations. A resilience plan should identify essential uses and backup duration, and should never assume that every alternative source is suitable for drinking.

By the Dev 360 teamNovember 2026South African context
Infrastructure planning documents

Key takeaways

  • Reduce demand before adding supply
  • Check local by-laws and permissions
  • Separate potable and non-potable systems
  • Budget for testing and maintenance

Begin with demand and essential uses

Review water bills, meter readings, leaks, irrigation schedules and peak demand. Identify essential uses during an interruption, such as sanitation, fire systems, cleaning or selected building operations. Demand reduction and leak repair can reduce the size and cost of storage needs. Estimate how long the building should operate during a disruption, then compare storage volume, refill opportunities and available space against that operating plan.

Assess alternative sources carefully

Rainwater tanks, boreholes and greywater systems have different uses and risks. Borehole use may involve permissions, registration or reporting obligations, and local conditions must be checked with the relevant authorities. Greywater generally needs appropriate treatment and should be restricted to suitable uses under the design and applicable rules. Keep potable and non-potable plumbing physically distinct, labelled and protected against cross-connection. Have a qualified professional assess water quality, backflow prevention and public health risks.

Confirm municipal rules and upkeep

Municipal by-laws and water service rules vary, so ask the local authority which requirements apply to the property before connecting tanks, pumps, boreholes or reuse systems. Establish a maintenance plan for pumps, filters, tanks and treatment equipment, including inspection and testing where appropriate. Retain drawings and service records. For a sectional title scheme, document ownership, access, costs and responsibility for common-property equipment through a clear trustee process.

Sources

Check each source’s current version before acting.

Short answers

Can greywater be used for drinking?

Do not assume greywater is potable. Its permitted and safe uses depend on treatment and local requirements. Keep it separated from drinking-water plumbing and obtain qualified advice on design and water quality.

Do I need permission for a borehole?

Requirements can depend on the water source, use, location and applicable national or municipal rules. Confirm the current requirements with the relevant authorities before drilling or abstracting water.

How much water should a building store?

The right volume depends on essential demand, interruption duration, refill options, available space and the intended uses. Measure actual demand and have a competent designer size the system for the building.