Africa’s infrastructure gap is a preparation problem as much as a money problem
Africa needs USD 130 to 170bn a year for infrastructure. Why projects stall before financial close, and what works in roads, energy, water and data.
Africa and infrastructure
Industrial parks create local value chains when anchor tenants buy from local suppliers, shared services lower costs, and training builds skills nearby. UNCTAD counted about 237 special economic zones in 38 African countries in 2019, and South Africa has 11 designated SEZs. Zones that stay isolated enclaves add jobs but few local suppliers.

In South Africa, enterprise and supplier development spending (targets of 2% and 1% of NPAT) can fund supplier upgrades, if it is structured as genuine development. See the ESD guide.
UNCTAD's 2019 inventory found about 237 SEZs in 38 of 55 African Union member states, plus more than 200 single-enterprise zones. South Africa had 11 designated SEZs in the dtic's 2020/21 listing.
Check each source’s current version before acting.
UNCTAD counted about 237 special economic zones in 38 of 55 African Union member states in 2019, plus more than 200 single-enterprise zones. These are historical figures from that inventory, not a live count of every African zone today.
South Africa had 11 designated special economic zones in the dtic's 2020/21 listing, also referenced in 2024 parliamentary material. Treat the count as tied to those sources and dates, because designations can change and a current total should be checked against the latest official listing.
Link anchor tenants to local suppliers and support those suppliers with shared services, training and upgrades. Industrial parks across Africa can use enterprise and supplier development to build local value chains, while reliable infrastructure helps them function as ecosystems rather than isolated sites.
Africa needs USD 130 to 170bn a year for infrastructure. Why projects stall before financial close, and what works in roads, energy, water and data.
How to write skills transfer and local participation into infrastructure contracts so they are measurable, lawful and enforceable, including PPR 2022.
The Pan African Impact Council is a planned Dev 360 congress on infrastructure delivery in roads, energy, water, data and manufacturing. What it is…
Talk to Dev 360