Building envelope · PPP spotlight

Hiring painting contractors for a sectional title scheme

Before hiring painting contractors, trustees should check product suitability and data sheets, and how old paint will be prepared and disposed of. At handover, insist on product batch records, an inspection report and disposal records for hazardous paint. The key standard here is Hazardous Substances Act and the 2024 regulations on lead in paint.

By the Dev 360 teamSouth African context
Maintenance worker inspecting the roof of a sectional title complex

Key takeaways

  • Product specification and compatibility with the substrate
  • At handover: product batch records and data sheets
  • Hazardous Substances Act and the 2024 regulations on lead in paint
  • Also check: construction Regulations for work at height

What to check before you appoint

  • Product specification and compatibility with the substrate
  • Surface preparation method
  • How lead-containing paint, if found, will be handled
  • Access equipment and working-at-height controls

What to ask for at handover

  • Product batch records and data sheets
  • Coat and film-thickness inspection where specified
  • Disposal records for hazardous paint
  • Guarantee terms

Rules and standards that apply

  • Hazardous Substances Act and the 2024 regulations on lead in paint
  • Construction Regulations for work at height

Common mistakes

  • Painting over damp or cracks
  • Unsafe scaffolding or rope access

Baseline checks

Start with the six baseline checks that apply to every contractor. Because painting and coatings is a major capital item, it also belongs in the 10-year maintenance plan.

Sources

Check each source’s current version before acting.

Important. Generic guidance for painting and coatings. Confirm the current municipal rules for your site.

Trade directory planned for 2027. Businesses can register interest in the Dev 360 Trade Directory. Paid listings do not imply PPP vetting.

See also: A protective coatings market entry · The coatings and waterproofing service line.

Through the PPP

Participants who deliver this

Dev 360 can outsource painting & coatings work to these participants, or introduce you.

Dev 360 capability
Construction and trades

Building and finishes practice

Building and finishing trades, one crew.

Services: Building construction · Brickwork · Plastering · Painting · Tiling · Ceilings and drywalling

Dev 360 capability
Building materials and coatings

Protective coatings supplier

Don't just cover the problem, solve it smarter.

Services: Waterproofing and water repellency · Rising-damp treatment · Stone protection · Timber protection · Masonry and exterior paints · Heat-reflective roof coatings · Photocatalytic mineral coating · Primers and cement additives · Cleaning and restoration

Not a guarantee of work. All participants

Short answers

How often should a sectional title complex be repainted?

A repainting cycle should reflect exposure, the substrate and the selected product; there is no single interval for every scheme. Record the cycle in the 10-year maintenance plan and inspect annually, as part of responsible South African sectional title maintenance.

What should trustees get at handover for painting and coatings?

Painting handover records should include product batch details and data sheets, a coat or film-thickness inspection where specified, and disposal records for hazardous paint. Retain the documents with scheme records and check the South African lead-in-paint requirements where relevant.

Where do schemes go wrong with painting and coatings?

Painting over damp or cracked surfaces and using unsafe scaffolding or rope access are common mistakes. Trustees should check the substrate and working-at-height controls, including the South African Construction Regulations, before accepting the contractor’s method.

PPP

All 43 industry spotlights

Trade-by-trade hiring checklists for sectional title trustees, grouped into nine industry groups.